Page 34: of Maritime Reporter Magazine (July 15, 1974)

Read this page in Pdf, Flash or Html5 edition of July 15, 1974 Maritime Reporter Magazine

CARRINGTON SLIPWAYS Pty. Ltd.

AUSTRALIA :bSbMl •giiXZ: t;

Send for details WE ALSO BUILD SHIPS OF ANY SIZE TO ORDER

CARRINGTON SLIPWAYS Pty. Ltd.

OLD PUNT ROAD

TOMAGO 2322, N.S.W. AUSTRALIA

AVAILABLE DELIVERY 1974 85' TUGS 33 TON BOLLARD PULL 2 x 1000 HP 105' TUGS 38 TON BOLLARD PULL 2 x 1250 HP 105' TUGS 50 TON BOLLARD PULL 2 x 1600 HP

Phone:NEWCASTLE 648071 Telex: 28185

European Agent:

EUROPEAN MARINE &

MACHINERY AGENCIES,

P.O. Box 1

BALMER LAWN ROAD

BROCKENHURST

HANTS S04 7TT, ENGLAND

Tel. 05902/3416 & 3023

Telex: 47509

Cable: CARRINGTON'S

MERCANTILE MARINE

ENGINEERING AND GRAVING DOCKS Co. N.V.

Antwerp-Belgium-Telephone 03/41.04.20 Telex 31219 Mercan B.

U.S.A. Representative:

FREDERICK A. GANTER

MARINE REPAIR AND CONSTRUCTION CORPORATION-INTERNATIONAL

Suite 1127-17 Battery Place, New York, N.Y. 10004-Telephone (212) 269-3170

Telex 129247 MAREPCON NYK

Offshore Drilling Platform —Largest Sea Structure

Ever Installed From Barge

The Ocean Engineering Department of

Lloyd's Register has just completed a check on structural analysis, fatigue calculations, piling analysis and launch analysis for the drilling/production platform "A" ordered by

Occidental of Britain Inc. for installation at their North Sea Piper Field.

In addition, Lloyd's Register Industrial

Services is inspecting steelwork for the plat- form during manufacture in Japan, Federal

Germany and France and surveying site fabrication and assembly at two main sites in Scotland and France.

The platform jacket is of tubular steel lattice construction with four main legs. It measures 500 feet in height by 200 feet square at the base. When the platform is floated out to the Piper Field on a flat- bottomed barge, it will be the largest sea structure ever installed in this manner.

The construction of this platform is an international operation.

The key role of assembling the parts for the platform is being carried out at the

Ardersier, Scotland, site of McDermott (Scotland) who are fabricating and erect- ing the lower 220 feet of the platform, in- cluding sections shipped from Japan. They will also complete the attachment of the upper 280-foot section of the platform when this is received from France, and will load out the completed 12,500-ton platform jack- et later this year for installation in 474 feet of water.

Dr. Potter Named

Navy Under Secretary

President Nixon has named Dr. David S.

Potter to the post of Navy Under Secretary, succeeding J. William Middendorf II who has been installed as Navy Secretary.

Dr. Potter has been serving as Assistant

Navy Secretary (Research and Development) since September 1973. Previously, he was director of research, General Motors Detroit

Diesel Allison Division, Indianapolis, Ind.

DECK LASHING CHAIN • TURNBUCKLES

SHACKLES • BOOMS • BLOCKS

ALL TYPES SHIP RIGGING • ANCHORS

ANCHOR CHAIN • CONNECTING LINKS

Complete Wire Rope Rigging Shop

Complete Mooring & Buoy Systems

WASHINGTON|||CHAIN

AND SUPPLY COMPANY 2901 Utah Avenue South • Seattle. Washington 98124

PO Box 3645 • Phone:(206)623-8500 • Telex 32-252

CUSTOM PULL TESTING of Rigging, Choin, All Types Cargo Gear 1,000-Ton Testing Machine-Approved by A.B.S.,

National Cargo Bureau, Lloyds and Department of Labor and Industries

LARGEST SHIP

REPAIR YARD at ANTWERP

A completely integrated full-service ship repair yard with total in-house capability to accomplish all types of ship repair work. • 5 Graving Docks to 100,000 D.W.T. capacity • New large capacity dock to be completed

September 1974—1,026 ft. x 164 ft. x 30 ft. • All Shops • Heavy Ste.el Fabrication • Diesel Service-Licensed Repair and Parts

Supplier for Sulzer, Burmeister & Wain, S.E.M.T.'

Pielstick. • Pierside Service 34 Maritime Reporter/Engineering News

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.