Page 34: of Maritime Reporter Magazine (July 15, 1974)
Read this page in Pdf, Flash or Html5 edition of July 15, 1974 Maritime Reporter Magazine
CARRINGTON SLIPWAYS Pty. Ltd.
AUSTRALIA :bSbMl •giiXZ: t;
Send for details WE ALSO BUILD SHIPS OF ANY SIZE TO ORDER
CARRINGTON SLIPWAYS Pty. Ltd.
OLD PUNT ROAD
TOMAGO 2322, N.S.W. AUSTRALIA
AVAILABLE DELIVERY 1974 85' TUGS 33 TON BOLLARD PULL 2 x 1000 HP 105' TUGS 38 TON BOLLARD PULL 2 x 1250 HP 105' TUGS 50 TON BOLLARD PULL 2 x 1600 HP
Phone:NEWCASTLE 648071 Telex: 28185
European Agent:
EUROPEAN MARINE &
MACHINERY AGENCIES,
P.O. Box 1
BALMER LAWN ROAD
BROCKENHURST
HANTS S04 7TT, ENGLAND
Tel. 05902/3416 & 3023
Telex: 47509
Cable: CARRINGTON'S
MERCANTILE MARINE
ENGINEERING AND GRAVING DOCKS Co. N.V.
Antwerp-Belgium-Telephone 03/41.04.20 Telex 31219 Mercan B.
U.S.A. Representative:
FREDERICK A. GANTER
MARINE REPAIR AND CONSTRUCTION CORPORATION-INTERNATIONAL
Suite 1127-17 Battery Place, New York, N.Y. 10004-Telephone (212) 269-3170
Telex 129247 MAREPCON NYK
Offshore Drilling Platform —Largest Sea Structure
Ever Installed From Barge
The Ocean Engineering Department of
Lloyd's Register has just completed a check on structural analysis, fatigue calculations, piling analysis and launch analysis for the drilling/production platform "A" ordered by
Occidental of Britain Inc. for installation at their North Sea Piper Field.
In addition, Lloyd's Register Industrial
Services is inspecting steelwork for the plat- form during manufacture in Japan, Federal
Germany and France and surveying site fabrication and assembly at two main sites in Scotland and France.
The platform jacket is of tubular steel lattice construction with four main legs. It measures 500 feet in height by 200 feet square at the base. When the platform is floated out to the Piper Field on a flat- bottomed barge, it will be the largest sea structure ever installed in this manner.
The construction of this platform is an international operation.
The key role of assembling the parts for the platform is being carried out at the
Ardersier, Scotland, site of McDermott (Scotland) who are fabricating and erect- ing the lower 220 feet of the platform, in- cluding sections shipped from Japan. They will also complete the attachment of the upper 280-foot section of the platform when this is received from France, and will load out the completed 12,500-ton platform jack- et later this year for installation in 474 feet of water.
Dr. Potter Named
Navy Under Secretary
President Nixon has named Dr. David S.
Potter to the post of Navy Under Secretary, succeeding J. William Middendorf II who has been installed as Navy Secretary.
Dr. Potter has been serving as Assistant
Navy Secretary (Research and Development) since September 1973. Previously, he was director of research, General Motors Detroit
Diesel Allison Division, Indianapolis, Ind.
DECK LASHING CHAIN • TURNBUCKLES
SHACKLES • BOOMS • BLOCKS
ALL TYPES SHIP RIGGING • ANCHORS
ANCHOR CHAIN • CONNECTING LINKS
Complete Wire Rope Rigging Shop
Complete Mooring & Buoy Systems
WASHINGTON|||CHAIN
AND SUPPLY COMPANY 2901 Utah Avenue South • Seattle. Washington 98124
PO Box 3645 • Phone:(206)623-8500 • Telex 32-252
CUSTOM PULL TESTING of Rigging, Choin, All Types Cargo Gear 1,000-Ton Testing Machine-Approved by A.B.S.,
National Cargo Bureau, Lloyds and Department of Labor and Industries
LARGEST SHIP
REPAIR YARD at ANTWERP
A completely integrated full-service ship repair yard with total in-house capability to accomplish all types of ship repair work. • 5 Graving Docks to 100,000 D.W.T. capacity • New large capacity dock to be completed
September 1974—1,026 ft. x 164 ft. x 30 ft. • All Shops • Heavy Ste.el Fabrication • Diesel Service-Licensed Repair and Parts
Supplier for Sulzer, Burmeister & Wain, S.E.M.T.'
Pielstick. • Pierside Service 34 Maritime Reporter/Engineering News