Page 31: of Maritime Reporter Magazine (October 15, 1984)

Read this page in Pdf, Flash or Html5 edition of October 15, 1984 Maritime Reporter Magazine

City Marketing Ltd., U.K.

Drew Ameroid International, H.K.

Dawes & Company Ltd., U.K.

Direction Technique de Constructions

Navales, France

Economic Information & Agency, H.K.

Fincantieri, Italy

GERMAN PAVILION:

Allweiler AG

Anschuetz & Co. GmbH

Conver Ingenieur-Technik GmbH & Co.

Deutsche Schiffsbeleihungsbank AG

Hatlapa Uetersener Maschinenfabrik

GmbH & Co.

Howaldtswerk-Deutsche Werft AG

Noris Tachometerwerk GmbH & Co.

C. Plath-Fabrik Nautischer Instrumente

Transtech Ingenieur GmbH •

Hong Kong United Dockyards Ltd.

Hyundai Heavy Industries Co., Ltd.,

Korea

INMARSAT, U.K.

Japan Ship Machinery Export

Association

Japan Ship Exporters' Association

Hayashikane Shipbuilding &

Engineering Co., Ltd.

Hitachi Zosen Corporation

Ishikawajima-Hirama Heavy

Industries Co., Ltd.

Kasado Dockyard Co., Ltd.

Kawaski Heavy Industries Ltd.

Minaminippon Shipbuilding

Co., Ltd.

Mitsubishi Heavy Industries Ltd.

Mitsui Engineering & Shipbuilding Co.,

Ltd.

Nippon Kokan KK

Osaka Shipbuilding Co., Ltd.

Sanoyas Corporation

Sasebo Heavy Industries Co., Ltd.

Sumitomo Heavy Industries Ltd.

Usuki Iron Works Ltd.

The Shipbuilders Association of

Japan

Korea Shipbuilding & Engineering

Corp.

Lloyd's of London Press, U.K.

Lufthansa German Airlines,

Germany

MacGregor-Navire International

AS, U.K.

National Westminster Bank Pic., U.K.

Raytheon Marine Company, U.S.

Samsung Shipbuilding & Heavy

Industries Co., Ltd., Korea

Schiffscommerz, East Germany

S.E.M.T.-Pielstick, France

Wormald Engineering Services

Ltd., U.K.

Wallem & Co. Ltd., U.K.

Bath Iron Works Awarded $4.5-Million Navy Contract

For Work On Frigates

Bath Iron Works Corporation of

Bath, Maine, has been awarded a $4,500,000 cost-plus-fixed-fee Navy contract for the post shakedown availability of the guided missile fri- gates USS Taylor (FFG-50), USS

Hawes (FFG-53), and USS Elrod (EFG-55). Work will be performed at the company's Bath yard and is expected to be completed in March 1986. This contract was not compet- itively awarded. The Supervisor of

Shipbuilding, Conversion and Re- pair, Bath, is the contracting activi- ty (N00024-80-G-2146). f lift-dock Tobruk, Libya Your lift-dock project

Expoship Far East 84

Advisory Committee

Frank Chao, President,

Wah Kwong & Co., (Hong Kong) Ltd.

David A. Gledhill, Chairman,

Hongkong United Dockyard Ltd.

Anthony Hardy, Chairman, Wallem &

Co., Ltd., Hong Kong

Robert C.F. Ho, Chairman &

Managing Director, Fairmont

Shipping (H.K.) Ltd.

Ca-Fre Hu, Managing Director,

Patt Manfield & Co., Ltd.

K.M. Koo, Managing Director,

Valles Steamship Co., Ltd.

Denis F. P. Li, Chairman,

P.S. Li & Co., Ltd.

John L. Marden C.B.E., Chairman,

Wheelock Marden & Co., Ltd.

Chairman, Hong Kong General

Chamber of Commerce

D.D.B. McLeod.J.P.,

Chairman, Hong Kong

Shipowners Association

David Newbigging, O.B.E., J.P.,

Chairman, Jardine Matheson & Co., Ltd.

Sir Yue-Kong Pao, C.B.E. LL.D., J.P.,

Chairman, World-Wide Shipping

Group

Nigel Rigg, J.P., Deputy Chairman and

General Manager, Union Insurance

Society of Canton Ltd.

M.G.R. Sandberg,C.B.E.,J.P.

Chairman, Hong Kong and Shangai

Banking Corporation

Frank W.K. Tsao, Chairman,

International Maritime Carriers Ltd.

C.H. Tung,Chairman,

Orient Overseas Container (Holdings) Ltd.

Circle 266 on Reader Service Card

October 15, 1984

It's time we talked about your complete solution with the Schiess-Def ries lift-dock.

Use our Worldwide experience as specialists in launching, lifting and transferring ships and let us provide you with the best solution in both economy and safety.

Economy: We are interested in saving you money during planning, construction and during operation. Smaller overall investment achieved by cost effective manufacture.

Reduced labour requirement during reduced docking time. Short Sea/Land/Sea time.

Safety: For your personnel, the ship and your lift-dock . The "rigid" platform, designed on the continuous beam principle is an integral bolted unit. The lifting system operates continuously, synchronously and smoothly. Direct load measurements taken at rope anchors are transmitted to a central indicator to avoid docking errors.

SCHIESS-DEFRIES GmbH

RO. Box 1111 46

Schiess-StraBe 61

D-4000 Dusseldorf 11

Tel.: 0211/586-0

Tx.: 8584431 sd d

OEFRIES lift-dock Dohar, Qatar lift-dock Oran, Algeria

The Complete Solution: The SCHIESS-DEFRIES lift-docklt: offers you more than just an alternative to other shiplifts.

The feasibility study: our engineers provide you with a professional appraisal. The lift-dock®: delivery and installation of its lifting system and platform.

The transfer system: flexible and adaptable to suit all dock conditions. The civil engineering: we can provide all engineering and construction aT . works. Modern technology - reliable, safe and fast is the

SCHIESS-DEFRIES aim.

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.