Page 34: of Maritime Reporter Magazine (May 1989)

Read this page in Pdf, Flash or Html5 edition of May 1989 Maritime Reporter Magazine

U.S. NAVY

Exhibit 2—Shipbuilding and Conversion Budget (in millions of $)

FY 1988 FY 1989 1990 1991

Qty $ Qty $ Qty $ Qty $

Construction

Trident Submarine (SSBN) 1 $1,260.8 1 $1,196.2 1 $1,228.6 1 $1,254.5

Carrier Replacement (CVN) 2 6.225.0 — — — — — —

Attack Submarine (SSN 688) 3 1,676.9 2 1,364.6 2 1,520.3 — —

New Attack Submarine (SSN 21) — 257.6 1 1,533.0 — 866.0 2 3,161.9

Aegis Cruiser (CG 47) 5 4,100.7 — — — — — —

Destroyer (DDG 51) — 5.5 4 2,826.1 5 3,600.7 5 3,604.7

Mine Countermeasure Ship (MCM) — — — — 3 341.5 — —

Coastal Minehunter (MHC) — — 2 196.7 3 230.3 3 214.9

Amphib. Landing Craft (LSD 41) 1 258.0 — — 1 229.3 1 232.7

Amphib. Assault Ship (LHD 1) 1 752.9 1 733.1 — — — 35.8

Ocean Surveill. Ship (TAGOS) — — 3 158.9 1 155.8 — —

Fleet Oiler (TA0-187) 2 256.4 5 689.9 — — — —

Fast Combat Support Ship (AOE) — — 1 363.1 1 356.4 1 357.7

Ocean. Research Ship (AGOR) — — — — 3 278.1 1 41.9

Landing Craft (LCAC) — 35.3 (15) 305.5 (9) 219.3 (12) 284.0

Ship Modernization/Conversion

Carrier Modernization (CV SLEP) 1 729.9 — 62.7 1 651.2 — 76.6

Crane Ship Conversion (TAC) 2 53.1 — — — — — —

Fleet Oiler Lengthening (AO 177) 1 44.1 2 75.0 1 35.7 — —

Moored Training Ship — — — — (1) 220.0 — —

Other costs — 319.6 — 376.8 — 486.4 — 500.7

Total Budget 19 $15,975.7 22 $9,881.6 22 $10,419.6 14 $9,765.4

Source: Department of the Navy

Exhibit 3—Navy Shipbuilding and Conversion

Five-Year Plan (FY 1990-1994)

FY 1990 FY 1991 FY 1992 FY 1993 FY 1994 FY 1990-94

Ship Construction

Trident Submarine (SSBN) 1 1 1 1 1 5

Attack Submarine (SSN 688) 2 — — — — 2

New Attack Submarine (SSN 21) — 2 3 3 3 11

Destroyer (DDG 51) 5 5 5 5 5 25

Mine Countermeasure Ship (MCM) 3 — — — — 3

Coastal Minehunter (MHC) 3 3 4 4 — 14

Amphib. Landing Craft (LSD 41) 1 1 1 1 1 5

Amphib. Assault Ship (LHD 1) — — 1 1 — 2

Ocean Surveill. Ship (TAGOS) 1 — 2 1 2 6

Ammunition Ship (AE) — — — 1 2 3

Fast Combat Support Ship (AOE) 1 1 1 1 1 5

Ocean. Research Ship (AGOR) 3 1 2 2 1 9

Ocean Surveill. Ship (AGOS) — — 1 — 2 3

Repair Ship (AR) — — — — 1 1

Salvage Ship (ARS) — — — — 1 1

SOF Landing Craft — — — (1) (6) (7)

Landing Craft (LCAC) J9] (12) (12) (12) (12) (57)

Total Construction 20 14 21 20 20 95

Ship Modernization/Conversion

Carrier Modernization (CV SLEP) 1 — — 1 — 2

Fleet Oiler Lengthening (AO 177) 1 — — — — 1

Moored Training Ship All — All — — (2)

Total Modernization/Conversions 2 — — 1 — 3

Total Number of Ships 22 14 21 21 20 98

Note: Figures in parentheses not included in totals

Source: Department of the Navy (continued) ers. In December 1988, the Navy negotiated a contract modification with Avondale which provides am- munition capability as well as in- creased oil capacity in the midbo- dy.

PROPOSED SHIP

PROCUREMENT BUDGET

FOR FY 1990/91

For FY 1990, $10.4 billion has been requested to fund construction of 20 new ships and perform two major conversions. In FY 1991, $9.8 billion was requested to build 14 ships—including two follow ships in the SSN-21 attack submarine pro- gram.

Shown in Exhibit 2 is the break- down of the shipbuilding budget request for the FY 1988-91 period.

Exhibit 3 shows the five-year ship- building plan.

A major change in the future pro- gram has been the deletion of three

SSN-688 submarines originally planned for FY 1991 and 1992.

There had been criticism of the

Navy's plan to overlap construction of the SSN-21 and SSN-688. The current plan is to end the SSN-688 program in FY 1990—and order two

SSN-21s in FY 1991, maintaining a construction rate of three SSN-21s per vear thereafter.

The Navy plans to build DDG-51

Aegis destroyers at the rate of five per year over the next five years.

However, due to budget pressures, this program is a target for stretch- out. The Congressional Budget Of- fice has estimated that buying three

DDG-51s per year versus five per year would produce cumulative sav- ings of $7.3 billion over the next five years.

IMA Associates, Inc. is an international management consulting firm. It performs industrial market research, project feasibili- ty studies and business planning assign- ments. The firm serves business clients in the U.S. and overseas, providing custom research reports tailored to specific man- agement requirements. Since 1974, IMA has completed more than 120 projects for firms or public organizations in 20 coun- tries.

For information about the firm's capabili- ties, contact: IMA Associates, Inc., 835 New

Hampshire Avenue, NW, Washington, D.C. 20037; telephone: (202) 333-8501; telex: 64325 IMA; or telefax: (202) 333-8504. 36

JIM'S PUMP REPAIR INC. m 48-55 36 St. fo-L.I. City, NY 11101 V

Established 1974 ^B. I INCORPORATED

JIM LAGONIKOS,

President

BOB MOONEY,

Sales & Service

Manager

Reconditioned Coffin & Pacific Pumps

A-1 Conditon

TYPE • F-CG - DE - DEB - IND -T- DEB-22

TBA • 12 -16 - I6V2

Service 24 HRS

TEL 718-392-4444

FAX 718-482-8372

Parts Available

TLX-TWX 710-5824847 JPRNYK

Circle 332 on Reader Service Card

Maritime Reporter/Engineering News

Circle 230 on Reader Service Card wvivfpsi

Propulsion Systems 1441 N. Northlake Way

Seattle, WA 98103

Phone: (206) 632-1441

Fax: (206) 633-4588

Propulsion Systems is alive and well in Seattle, Washington.

And, as exclusive U.S. distributor of • world class Heimdel Controllable

Pitch Propellers, business is booming.

PSI also manufactures bow thrusters for large yachts and commercial vessels of all types.

Besides all that, as a division of Unimar, PSI has complete shipyard capabilities for quick turnaround and total servicing.

Write or call today to find out how PSI can help you.

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.