Page 9: of Maritime Reporter Magazine (July 1996)
Read this page in Pdf, Flash or Html5 edition of July 1996 Maritime Reporter Magazine
nearly identical to the system recently installed on M/V
Klahowya, another WSF vessel.
Crew training was an important component in the bid evaluation.
Siemens will provide three weeks of classroom training for each crew, as well as two months of onboard operating, maintenance and repair training. Work will begin after the busy summer season, with the M/V
Nisqually first on the worklist.
The 75-car, 800-passenger vessel will make voyage through the
Hiram D. Chittenden Locks to
Lake Union Dry Dock, and work will take approximately six months to complete. MA" Illahee and M/V Quinault will follow. To ensure a smooth refit, Siemens is setting up an on-site office near the
Lake Union facility. Project
Manager Maryse Langevin from
Siemens Marine's headquarters in
Montreal, and Contract
Administrator Nina Sdunzig will staff the office, while Andre
Godin, P.E., will be the on-site engineer and liaison between the company and shipyard.
The WSF system has three
Jumbo Mark II auto ferries under construction at Todd Shipyards in
Seattle, Wash. Siemens is the propulsion control, and alarm and monitoring provider for these ships as well.
Exxon Finalizes
Agreement In $ 15
Billion Project
Project estimated to produce 2.5 billion barrels of crude oil, 15 trillion cubic feet of gas
Exxon Corporation announced that an agreement has been reached by the Sakhalin I
Consortium to formally declare the
Sakhalin I Production Sharing
Agreement effective June 10, and begin evaluation work on the bil- lion Sakhalin I project, offshore
Sakhalin Island, worth an estimat- ed $15 billion.
The project would involve the development of an estimated 2.5 billion barrels of crude oil and con- densate and 15 trillion-cubic-ft. of gas, equal to a total of 5 billion oil equivalent barrels, in three off- shore fields. The fields are located in water depths of up to 165 ft. (50.3 m), 15 to 20 miles off the northeastern coast of Sakhalin
Island.
K.T. Koonce, chairman of Exxon
Neftegas Ltd., an affiliate of Exxon
Corporation, stressed the impor- tance of this significant multi- national project to the people of
Sakhalin Island and the Russian
Federation. "The Sakhalin I pro- ject should make a major contribu- tion to economic growth in the
Russian Far East region.
According to our estimates, over the life of the project, Sakhalin I
July, 1996 could generate many billions of dollars in revenues from sales of hydrocarbons and be responsible for the creation of thousands of jobs. The majority of the invest- ment and operating expenditures required for labor, materials and services is expected to go directly to the Russian private sector."
In keeping with the consortium's desire to proceed as rapidly as pos- sible, a well will be drilled and tested, and state-of-the-art 3D seismic work will be conducted this summer. The well will be drilled in the Arkutun-Dagi field using
Sakhalinmorneftegas' OKHA drilling rig.
This is the first part of a $200 to $300-million resource appraisal program that is required to better define estimates of reserves in the three fields, Chayvo, Odoptu and
Arkutun-Dagi. The appraisal pro- gram includes drilling, coring and testing additional wells, as well as conducting additional 3D seismic surveys.
The multinational Sakhalin I
Project Consortium includes two
Russian companies, Rosneft-
Sakhalin and
Sakhalinmorneftegas-Shelf, the
Japanese company Sakhalin Oil and Gas Development Co., Ltd., (SODECO) and Exxon Neftegas
Limited, an affiliate of Exxon
Corporation and operator of the project. Exxon and SODECO each
Now Cummins Marine has an even bigger fleet of engines that deliver both strong endurance teamed with strong performance.
Check out these ratings:
ENGINE CONTINUOUS MEDIUM CONTINUOUS
MODEL BHP (KW) RPM BHP (KW) RPM
KTA38-M0 750 (559) i 5 1600 850 (634) <6 i 1800
KTA38-M1 900 (671) ( i 1600 1100 (821) t i 1800 1000 (746) 1 i 1800
KTA38-M2 1200 (895) t !> 1800 1300 (970) i !> 1800 1050 (783) t i 1600
KTA50-M2 1400 (1044) t i 1600 1700 (1268) t i 1800 1600 (1194)1? i 1800 1800 (1343) <6 i 1900
To keep your engine delivering top performance,
Cummins Marine has over 1,500 worldwide service centers staffed with Qualified Marine
Technicians and Certified Application
Engineers.
ONLY THE STRONG SURVIVE.
E-mail: [email protected]
Internet: http://www.cummins.com/marine/marinehm.html
CUMMINS MARINE
Charleston.SC, U.S.A. Phone:803-745-1585 Fax:803-745-1549
CUMMINS AMERICAS, INC.
Miramar, Florida, U.S.A. Phone:305-431-5511 Fax:305-433-5797
CUMMINS ENGINE COMPANY, LTD. Daventry, Northants, England Phone:44-1327-76000 Fax:44-1327-79412
CUMMINS DIESEL SALES CORP.
Singapore Phone:65-265-0155 Fax:65-264-0664
CUMMINS DIESEL AUSTRALIA
Scoresby, Victoria, Australia Phone: 61-3-9765-3222 Fax: 61-3-9764-0034
CUMMINS KOREA LTD.
Seoul, South Korea Phone:82-2-3452-4313 Fax:82-2-3452-4113
Circle 219 on Reader Service Card
OM^JanO' Blue 6A
FAIRING COMPOUND • easy filling, smoothing and fairing of damaged surfaces, weld seams, joints and castings • smooth spreadable consistency with non-sagging properties • forms tenacious permanent bond
Two-component (epoxy and hardener) structural repair compound can be sanded or ground to a feather edge; provides excellent cosmetic base for finish coating; cures for sanding in 3 hrs at 72°F.
Full cure: 24 hrs. /7wPhiladelphia Resins
P.O. Box 309, Montgomeryville, PA 18936 215/855-8450
Fax 215/855-4688 complete family of chocking, coating and repair compounds
Circle 280 on Reader Service Card
Hatchable Galley
Equipment.
Hatchable to 26" x 66", Lang marine equipment eliminates the need for expensive hull cuts.
Other high quality, standard marine features include: • Stainless Steel Exterior • Marine Latches, Grab Bars & Sea Rails • Flanged Legs or Toe Base
For more information about Lang Marine
Griddles, Ranges, Ovens and Fiyers, please call: (800)882-6368 lane
Since 1904 9040 Willows Road • Redmond. WA • 98052 • Fax: (206) 882-2373
Circle 255 on Reader Service Card « "i