Page 26: of Maritime Reporter Magazine (May 1998)
Read this page in Pdf, Flash or Html5 edition of May 1998 Maritime Reporter Magazine
»o A
HONOLULU SHIPYARD
HONOLULU HI 1 ARS-ROH (continued) advanced composites and super- computers to new propeller designs and electric drive propulsion sys- tems.
In FY 1988 spending for Navy technology development will exceed $9.5 billion. Next year the technolo- gy development budget is projected to be $9.2 billion.
Shown in Exhibit 6 are some of the major technology development programs planned in FY 1988 and 1989. These and more than 200 oth- er technology development pro- grams are detailed in IMA's new report The New Naval Technology
Program—A Detailed Guide to $9.5
Billion in New Annual Sales for
Manufacturers, Engineering Firms and Suppliers. •
Exhibit 4
PRIVATE SHIPYARDS WITH NAVY OVERHAUL AND REPAIR PROGRAMS (1 March 1988)
GENSHIP
COLONNA SHIPYARD
NORFOLK VA 1 DD DSRA
BOSTON MA 1 FF-ROH 1 FFG-ESRA
PENN SHIP
CHESTER PA 1 AFDM-ROH
SW MARINE
SAN PEDRO. CA 1 LST-DPMA
TODD SHIPYARDS
SAN PEDRO. CA 1 FFG-SRA 1 ARS-ROH
PHILLY SHIP
PHILADELPHIA PA 1 FFG-SRA
NEWPORT NEWS SB
NEWPORT NEWS VA 1 SSNSRA
NQRSHIPCO
NORFOLK VA 1 MSO-ROH 1 AD-ROH 1 AO-PMA 1 DD-SRA 1 DDG-SRA 1 AS DSRA 1 AFDM-ROH
JONATHAN CORP
NORFOLK VA 1 LST-PMA 1 AOR-PMA 1 FF-SRA
METRO MACHINE CORP
NORFOLK VA 1 LPDDPMA 1 LPH PMA 2 FF-ROH 1 LST-PMA
MOON ENGINEERING
NORFOLK VA 1 LPD-PMA
NORTHWEST MARINE
PORTLAND. OR 1 DD-ROH
CMI/SERV. ENG/SW MARINE
SAN FRANCISCO. CA 1 LPD-ROH 1 AE-PMA 1 AFS-DPMF
SAN DIEGO. CA 3 DD-ROH
CAMPBELL IND
SAN DIEGO CA 1 FFG-DSRA 1 MSO-DSRA
CMI
SAN DIEGO CA 2 FF-DSRA
AVONDALE SHIPYARDS
NEW ORLEANS LA 2 FFG-ESRA LITTON (INGALLSl
PASCAGOULA. MS 1 FFG-DSRA
RUNYAN MACHINE 81 BOILER
PENSACOLA FL 1 PHM-DSRA
SW MARINE
SAN DIEGO. CA 1 DDG-DSRA 1 FFG-PMF
NATIONAL STEEL
JACKSONVILLE FL 1 DDG-SRA
QETYENS
CHARLESTON SC 1 ARDM-ROH 1 ASR-ROH 1 FFG-SRA
NORTH FLORIDA SHIPYARD
METAL TRADES
JACKSONVILLE. FL 1 MSO-ROH 1 FFG-DSRA
ATLANTIC DRYDOCK
CHARLESTON SC 1 FFG-SRA
Exhibit 5—Ship Maintenance & Modernization (in millions of dollars)
FY 1987 FY 1988 FY 1989
Ship Overhauls 1,859.4 1,271.8 734.1
RA/TA 1,506.4 1,485.9 2,060.5
Modernization 1,342.5 1,026.1 1,077.0
IMA 368.4 325.2 321.1
Tech Support 145.6 137.5 139.7
Outfitting 289.9 315.4 360.5
Berthing and Messing 49.0 32.0 39.9
Inactivations 25.7 66.7 110.6
TOTAL: Ship Maint & Mod 5,586.9 4,660.6 4,843.4
Number of Overhauls (Units) 39 27 23
Source: Department of the Navy • A major high-level effort has been initiated to develop revolutionary surface ship de- signs • Engineering development of the SSN 21 will require expenditures of more than $400 million over the next two years • More than $800 million is to be spent over the next five years on advanced attack submarine concepts—a major new initia- tive to be managed by DARPA • Design and development of nuclear pro- pulsion technology will continue to exceed $700 million annually • D-5 ballistic missile development expendi- tures will exceed $1.6 billion over the next two years as the program transitions to the production stage • Tomahawk cruise missile development ex- penditures will exceed $130 billion over the next two years
Exhibit 6—Highlights of
Navy New Technology Program • Sea Lance ASW standoff weapon develop- ment expenditures will exceed $150 mil- lion in FY 1988-89—a figure lower than originally planned due to budget con- straints • Funding for development of the MK 50 advanced lightweight torpedo (ALWT) has been substantially increased in the new
FY 1989 budget—with two-year funding of development expenditures now pro- jected to exceed $275 million • Project definition contracts will be awarded this summer to begin a 30- month design and engineering phase for the new generation mine • Expenditures over the next two years for
Aegis engineering and development will exceed $350 million • More than $118 million is earmarked in
FY 1988-89 for surface ship ASW system development and engineering • Development and engineering of sub- marine sonar systems will exceed $275 million over the next two years • Full-scale engineering has begun on the $7.3 billion program to develop and de- liver 28 AN/BSY(2) submarine combat systems • Expenditures to develop the Fixed Distrib- uted System (FDS)—a key component of future offboard ASW surveillance—will to- tal $170 million in FY 1988-89 • More than $97 million over the next two years will be spent on developing ad- vanced submarine communications sys- tems • Almost $87 million will be available in
FY 1988-89 for developing new manufac- turing technology
Source: International Maritime Associates,
Inc.
Newport News
Awarded $724.4 Million
To Begin Two Carriers
Newport News Shipbuilding &
Dry Dock Co., Newport News, Va., has received a U.S. Navy contract worth $724.4 million to begin the construction of two aircraft carriers,
CVN-74 and -75. The two flattops would be the Navy's seventh and eighth Nimitz Class aircraft car- riers.
At present, Newport News Ship- building is constructing two car- riers, the USS George Washington (CVN-73) and the USS Abraham
Lincoln (CVN-72). The Lincoln was recently launched and christened at ceremonies at the yard. The 1,092- foot-long Lincoln is scheduled to be commissioned in 1989.
ASMAR Launches New
Transport Vessel
For Chilean Navy
The Chilean shipbuilder and re- pairer ASMAR recently launched the new 2,767-metric-ton transport vessel it is building for the Chilean
Navy. Construction was at AS-
MAR's Talcahuano yard, and de- livery is scheduled for July 1988.
The vessel, which will have an average speed of 15 knots, a crew complement of 80 and a passenger capacity of 250, is equipped with a helicopter landing deck and has a container handling capacity of 42
TEUs. As yet unnamed, it will be powered by two diesel engines MAK 8M453B of 3,600 hp each at 600 rpm, allowing a maximum speed of 18 knots. Electric power will be pro- vided by two 400-kw generators, and one 500-kw and one 75-kw genera- tor.
The vessel will have an approxi- mate overall length of 338 feet, breadth of 56 feet and draft of 18 feet. The American Bureau of Ship- ping has been appointed for inspec- tion and certification of the vessel.
For free literature on ASMAR's facilities and capabilities,
Circle 76 on Reader Service Card 28 Maritime Reporter/Engineering News