Beginning this month, John
Waterhouse, P.E., president,
Elliott Bay Design Group,
Seattle, Wash., will be providing
MR/EN readers with insight and innovation withn the passenger vessel industry.
Marine A/C by Flagship Marine
Price, Quality, Schedule
Circle 259 on Reader Service Card or visit www.maritimereporterinfo.com
By: John W. Waterhouse, P.E.,
President, Elliott Bay Design Group
That's the sign I saw once in a Maine boatyard. Big, bold letters.
Underneath it said, "Pick two". That's the dilemma for any provider of goods or services. Low price, high quality, quick schedule. Our customers want all three objectives, our industry often has challenges in providing just one of those goals.
As the president of a naval architec- ture firm I have asked myself how we can deliver a better product on sched- ule at a competitive price. If a trade- off must be made, do clients want lower cost and higher risk in the ship- yard? Do they understand that a prop- erly scheduled job allows for better shipchecks and good information (hopefully) from the vendors? If budget is the overriding issue, what documents need to be produced by the engineering firm to achieve that result?
As I write this I am returning from a meeting with an unhappy customer.
The project involved interiors, subcon- tractors, federal funding requirements and a 28- year-old ferry. We had missed some items, the shipyard was skilled at identifying change orders, and there were issues related to asbestos, lead paint, and coal tar epoxy. The client was faced with a substantial increase in project cost.
The meeting could have been a rant session on how we failed to provide the superior level of engineering they had come to expect from us. Instead, our collective focus was on identifying problems, seeking their root causes, and creating processes to prevent any recurrence of such problems on future projects. A thread uniting the prob- lems was poor communications.
An engineer's challenge is to com- municate with a customer about their explicit and implicit requirements.
The engineer can then prepare calcula- tions and designs using the principals of physics, appropriate regulations, and accepted design standards. He/she must then capture that work in docu- ments, generally plans, specifications, and estimates. These documents form another type of communication with vendors, shipyards and regulatory agencies. This paperwork allows these other entities to conduct their own assignments of supplying equipment, building the vessel, and verifying that requirements have been met.
This client meeting I mentioned above allowed the engineer and the shipowner to exchange ideas on how to improve communication. As the engineering firm we need to hone our skills in eliciting information from the customer and then presenting what we think we heard back to the client. The shipowner needs to get clear direction and buy-in from their own internal customers. Collectively, we recognize that quality efforts in the design pack- age reduces cost growth in the ship- yard. It results in better bids with less risk of litigation at the end of the proj- ect.
My advice to the industry at large is to use the Maine boatyard sign as a starting point for communication. Use emails, letters, reports, sketches, checklists, models, renderings, and memos. Seek out whatever works to generate a dialogue about a project.
Assume nothing. Ask questions and repeat back the answers. Time spent on these communications tools at the beginning of a project will help avoid surprises and increased cost. I can assure you that the Elliott Bay Design
Group team will be focussing on good communication with our customers, vendors, and shipyards. r CRANKSHAFT ^
GRINDING
While Installed in Engine • CRANKPIN AND MAIN
JOURNAL REFURBISHING
While crankshaft is in engine • ALL TYPES OF ON-BOARD
MACHINING Cylinder boring, engine top decks, horizontal joints, couplings, journals • LINE BORING OF MAIN
BEARING POCKETS
Laser and Optical
Alignment • METALSTITCH®
Repair of cracked or broken cast iron engine blocks
IN-PLACE MACHINING COMPANY
USA: International: FAX: 800-833-3575 414-562-2000 414-265-1000 24 HOUR EMERGENCY SERVICE , day or night, 365 days a year email: [email protected] Website: www.inplace.com
Circle 234 on Reader Service Card or www.maritimereporterinfo.com 1-20 Tons
Water, Air & Keel cooled
Rooftop air cooled Marine a/c by the legendary RVP - Coleman® Mach®
HI
Ideal for; Cranes, Pilothouse, Flvbridge,
Workboats, Containers, Liveaboards: 13,500 BTUs with heat & Install kit
Only $899.95! www.flagshipmarine.com sales® flagshipmarine.com iJKLP lugship A/farine 7 t commenM / V I fMor,Dr«i ^ X r Prices !
Phone: 772-283-1609 Fax: 772-283-4611
Watts: 800-316-6426 Stuart, FL USA
Manufactured with pride in the USA 3-5 ton vertical units shown
Low est long-term inaintainence expense
The most durable and simple design possible
Evolved over many years of testing and experience
Chosen over all others by the
US & Canadian
Coast Guard since 1996
January, 2003 37