Page 10: of Maritime Reporter Magazine (September 2003)

Read this page in Pdf, Flash or Html5 edition of September 2003 Maritime Reporter Magazine

Vessels

IZAR Delivers LNG Inigo Tapias

IZAR Sestao Shipyard has delivered the LNG Inigo Tapias, which will be operated by the company F. Tapias for

Repsol YPF-Gas Natural. After conclu- sion of tests, carried out by the shipyard in the Gas Natural facilities in Huelva and valued by the shipowner, the ship was delivered completely operative and was delivered a month ahead of sched- ule. During the tests, the cargo has

Leave Nothing Behind

With Thor-Lube

Thordon's Non-Metallic Bearings And No-Sheen Lubricant

Establish Thor-Lube As The Proven Alternative To

Oil Lubricated Stern Tube Bearings

The environmental goal for ship owners and managers has never been clearer! All sources of ship-based oil pollution must be — evaluated and eliminated, and when it comes to eliminating stern tube oil,

Thordon Bearings is playing a key role. ||g|

Developed by Thordon Bearings, the ^f^ufj*! environmentally friendly Thor-Lube stern tube bearing system offers ship jg _ owners a proven alternative to oil lubricated stern tube bearings. The ^(5®

Thor-Lube system consists of non- f' metallic Thordon XL bearings, TL3G I biodegradable water-based lubricant and a lubricant circulation and monitoring package.

Approved by all major

Classification Societies, commercial acceptance of the Thor-Lube system continues to grow.

Contact us for a copy of our references and new Thor-Lube brochure. And... never worry again about environmental issues caused by an oil sheen from even a small amount of stern tube oil leakage. inOkoon

Thordon Bearings Inc. 3225 Mainway, Burlington, Ontario Canada L7M 1A6

Tel: 1.905.335.1440 • Fax: 1.905.335.4033 www.thordonbearings.com

Main Pari iculars

Length 933 ft. (284.4 m)

Breadth 139 ft. (42.5 m)

Draft 37 ft. (11.3 m)

Depth 83 ft. (25.4 m)

Speed 19.5 knots

Crew 40 people

Propulsion: 28,000 kW at 83 rpm generated by one steam turbine type Kawasaki-IZAR, provided by the

IZAR Factory of Turbines. This factory, located in

Ferrol. has also provided the condensator of the propu- sion plant.

Above, Inigo Tapias after its delivery. Below, the inside of one of its massive tanks. reach quantity of 5,000 cu. m. of gas.

The Inigo Tapias has the capacity to transport 138,000 cu. m. of liquefied natural gas at 163 degrees C below 0, in four tanks with a double membrane type

No96 as a system of isolation and con- tention of cargo. Inigo Tapias is the first

LNG of this dimension built in Spain and the first of a series of five that IZAR has under construction for Repsol YPF,

Gas Natural and Union Fenosa. IZAR is the only shipyard in Europe and among the few in the world, capable of the con- struction of this type of ship -high tech- nology and added value- and has achieved a strong position in this sector.

Diesel Engines Factory in Manises provided five deck cranes, three hose handling cranes type GPH 500-1224 and two service cranes type GPS 320-1218.

Circle 178 on Reader Service Card

Seaspan Container Lines

Orders Nine Ships

Seaspan Container Lines has placed an order for nine new 4,250 TEU container ships, which will be chartered to the Canadian ship- ping company, CP Ships. As the 36th large containership Seaspan has ordered from

Samsung Heavy Industries over the past three years, the new ships will be built at

Samsung Heavy Industries, in South Korea. 10

Circle 269 on Reader Service Card

Maritime Reporter & Engineering News

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.