Page 57: of Maritime Reporter Magazine (November 2017)

The Workboat Edition

Read this page in Pdf, Flash or Html5 edition of November 2017 Maritime Reporter Magazine

LNG ASPECTS

A Wärtsilä LNG bunkering system completes the company’s LNG Pac offering of fuel storage and sup- ply “designed with the smallest onboard footprint” for a tank, connection and process kit (in cold-box). Robert

Allan documents con? rms the surprisingly small space adjustments required to use Wärtsilä LNG storage tanks for some LNG tug models designed by the Vancouver-

Put Safety & Performance First based out? t: “The aft deck space on many tugs is thus often just a large empty area. We considered it prime real estate (on the Robert Allen Rangler design) for lo- with CEJN’s Marine Service Program

Customize Your Perfect Marine Service Kits for

Ultra High-Pressure Hydraulics

CEJN Hose Kits High-Pressure 10,150 to 58,000 PSI

Couplings with CiS Tracking Tag

Max. Working

Pressure up to 58,000 PSI

Gauges Distribution Blocks Adapters %K5+FGPVK?ECVKQP6GEJPQNQI[HQT*KIJ2TGUUWTG*QUG#UUGODN[

NFC chip embedded into the safety label

Traceability *QUG4GEGTVK?ECVKQP .KHG%[ENG+FGPVK?ECVKQP

Hydraulic Pumps

From 10,150 PSI Hand Pumps to 34,800 PSI Air Driven Hydraulic Pumps

Breathing Air Quick Connect eSafe Couplings for Safety

Couplings and Hose Kits in Pneumatic Operations

Water-cooled:

Series 340

Leak-free hose connections Safety function prevents Vented Safety Function eliminates hose whip.

Piriou’s Ost 30 maneuvering with pre-assembled hose kits accidental disconnect Comes standard on eSafe couplings 1-847-263-7200 [email protected] www.cejn.us www.marinelink.com 57

MR #11 (50-57).indd 57 MR #11 (50-57).indd 57 11/7/2017 11:46:40 AM11/7/2017 11:46:40 AM

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.