Summary of Recent Production Floater Orders 2017 through January 2018 (excludes FSRUs and FSOs)

Unit Field LocationField OperatorLease or OwnNew/ Conv/ RedeployEPC ContractorOrder Date

Floating Production Storage Of? oading Units

Congo Perenco Lease Conv Keppel 2017 Jun

Tempera FPSO

Brazil Petrobras Lease Conv Modec 2017 Oct

Carioca MV30 FPSO

Brazil Petrobras Lease Conv Modec 2017 Nov

Mero Pilot (ex-Libra Pilot) FPSO

TBD TBD Lease New SBM 2017 June

Fast4Ward Spec FPSO

GuyanaExxonMobil Lease Conv SBM 2017 June

Liza #1 FPSO

GabonBW Offshore Own Redeploy BW Offshore2017 July

Adolo (ex Azurite) FPSO

UK Hurricane Lease Redeploy Bluewater2017 July

Aoka Mizu FPSO

Brazil Petrobras Own New CIMC Raf? es (hull)2017 Dec

Sururu FPSO

Norway Statoil Own New Sembcorp Marine (hull)2017 Dec

Johan Castberg FPSO

Vietnam Repsol Lease Redeploy Yinson 2017 Apr

Ca Rong Do (OSX 1) FPSO

MalaysiaOctanex Lease Conv MTC Engineering2017 Feb

MTC Ledang FPSO

UK Shell Own New Fluor 2018 Jan

Penguins FPSO

Floating Oil/Gas Production Units

Vietnam Repsol Own New PTSC 2017 Apr

Ca Rong Do TWLP

USA BP Own New Samsung2017 Jan

Mad Dog 2 SEMI

USA Shell Own New Sembcorp Marine2017 Dec

Vito SEMI

Floating LNG Production Units

Mozambique ENI Own New Technip/Samsung/JGC2017 June

Coral South FLNG

Source: WER Floating Production Database on a future FPSO contract with short ex- cate an 18 slot dry tree TWLP to use with b/d oil – and storage for 400,000 bbls. 7% in the GOM. The remaining 13% are ecution requirement. According to SBM, an FPSO on the Ca Rong Do oil/gas ? eld spread over a half dozen other regions.

Fast4Ward can accelerate delivery of an offshore Vietnam. PTSC is fabricating the MTC Ledang FPSO - Puteri Bangsa, a Of the total projects, 53% involve an

FPSO by up to 12 months. unit in its Vung Tan facility. This is the ? rst 350,000 barrel 1992-built tanker formerly FPSO, 10% another type oil/gas produc-

TWLP fabrication contract to be executed used as an FSO, was modi? ed into a small tion ? oater, 33% liquefaction/regasi? cation

Mad Dog 2 Production Semi - In Janu- by PTSC. FloaTEC has a $40 mil contract 15,000 b/d FPSO for use on the Ophir ? eld ? oater and 4% storage/of? oading ? oater. ary 2017 Samsung was awarded a $1.27 to provide engineering and support servic- offshore Malaysia. MTC Engineering had As for timing, 64% of the projects in the billion contract to build the production semi es to PTSC during the construction period. the EPC contract + lease to supply the planning queue are likely to lead to a pro- for BP’s Mad Dog Phase 2 project The unit unit. Keppel had the conversion contract. duction system contract within the next will have capability to produce 110,000 Coral South FLNG - ENI in June ? ve years. The remaining 36% consists b/d oil and 25 mmcf/d gas from up to 14 2017 proceeded with its project to devel- Sururu FPSO - In Dec 2017 Petro- of longer term projects where the produc- production wells. Mad Dog 2 will be used op LNG exports offshore Mozambique bras contracted with CIMC Raf? es to tion system order is likely after 2022. In to develop further oil discoveries near the using an FLNG with 3 mtpa LNG + 0.5 build the FPSO hull for the Sururu/Atapu the very near term are 24 FPSO projects, original Mad Dog Spar in the GOM. Pro- mtpa condensate production capacity. Norte ? elds in Santos Basin. The hull several FPU projects and 20+ FLNG/ duction is expected to begin in late 2021. Technip/Samsung/JGC JV was selected will be VLCC size, designed to support FSRU projects likely to reach an invest- for the $ 2.5 billion FLNG EPC contract. a 100/120,000 b/d + 200 mmcf/d topside ment decision within 2018/19.

Vito Production Semi - In December The FLNG will be 439 m long, 65 m plant. Delivery of the hull is scheduled in Details for all known planned projects 2017 Sembcorp Marine received an LOI wide – and displace 210,000 tons. Pro- mid-2019. This was earlier to be the P 71, are provided in the online WER Floating from Shell for a turnkey contract to con- duction start is scheduled in mid-2022. the sixth FPSO in the serial hull project. Production Database. struct the production semi for the Vito ? eld in the GOM. The production unit will Penguins FPSO - Shell in January Planned Projects

For more information contact: comprise a single topside module support- 2018 contracted with Fluor to supply an Looking forward, we are currently track- ed on a 4-column semisubmersible hull. FPSO for use on the Penguins cluster in ing 227 ? oating production projects in vari-

It will be moored in water depth of 1160 the UK sector of the northern North Sea. ous stages of planning.

Jim McCaul @ meters and have production capacity of The production unit will be based on a Geographically, 35% of the projects [email protected] 100,000 b/d oil + 100 mmcf/d gas. Sevan Marine 400 cylindrical design in the planning queue are located in

Ca Rong Do TWLP – In April 2107 FPSO. It will have peak production capa- South America, 26% in Africa, 11% in Jean Vertucci @

PTSC received an EPCI contract to fabri- bility of 45,000 boe/d – including 35,000 SE Asia, 8% in Northern Europe and [email protected] © sadagus/Adobe Stock www.marinelink.com 51