Page 81: of Maritime Reporter Magazine (August 2018)
The Shipyard Edition
Read this page in Pdf, Flash or Html5 edition of August 2018 Maritime Reporter Magazine
TABLE 2 each of the test levels shown in Table 2, then returned to the 0° Pitch and 0° Roll and at the conclusion of the testing. position and proper operation is again
Test Levels Length of Test con? rmed. The length of both the Static • Static and Dynamic Inclination and the Dynamic testing is not set to a
Voltage Variation + 10% Voltage +5% Frequency Long Enough To Check Operation + 10% Voltage -5% Frequency Long Enough To Check Operation
This test method is performed to deter- de? ned time, but rather “long enough to -10% Voltage +5% Frequency Long Enough To Check Operation mine the ability of the EUT to withstand check operation”.
-10% Voltage -5% Frequency Long Enough To Check Operation the expected stresses due to static and dynamic inclination conditions that can Conclusion
Voltage Transients +20% Voltage +5% Frequency 3 Seconds Between Transients occur at sea, and to ensure that perfor- While it is highly likely that ? ux and +20% Voltage -5% Frequency 3 Seconds Between Transients mance degradations or malfunctions will more millions of words will be written -20% Voltage +5% frequency 3 Seconds Between Transients not be produced by the in-service static re: Ballast Water Management Systems -20% Voltage -5% Frequency 3 Seconds Between Transients inclination environment. areas, the USCG environmental simula-
During this test, the EUT is placed in tion and voltage variation requirements the appropriate Mode of Operation and six test steps. With the EUT positioned and +15° Roll position, 0° Pitch and - for system components are very well subjected to both static and dynamic on the inclination machine and with the 15° Roll position, and ? nally back to 0° de? ned and have been tested to on a inclination test conditions, as shown in machine set at 0° Pitch and 0° Roll posi- Pitch and 0° Roll position. After Static dailybasis for quite some time. The test
Table 1. Inclination is applied about the tion, the EUT is operated in its de? ned Inclination is completed Dynamic Incli- methods used are based on and rooted vertical axes in both directions. To per- in recognized national or international mode of operation and proper operation nation is performed. For the Dynamic form this testing the EUT is placed on con? rmed. The machine is then adjusted Inclination testing the inclination ma- consensus standards. When applied to the Incline Table and oriented to the In- to the following positions and at each chine is set to operate simultaneously BWMS components the test methods clination Machine table top as it would one, proper operation of the EUT is con- at ±22.5° Roll, ±7.5° Pitch. During this provide assurances for proper operations typically be aboard a ship. ? rmed, +15° Pitch and 0° Roll position, testing, the EUT is monitored for proper when such equipment is place into a ma-
The Static Inclination test consists of -15° Pitch and 0° Roll position, 0° Pitch operation. The inclination machine is rine environment.
ALWAYS COMPLIANT
A Better Ballast Water
Treatment System…
E? cient, sustainable and e? ective, the Envirocleanse inTank™ ballast water treatment system is the most advanced and sustainable system on the market. Our inTank™ solution does not require ? lters or changes to your current ballasting operations.
Guaranteed compliance every time and in every location.
LOWER COST • LESS POWER DEMAND • NO FILTERS
No impact to cargo operations • No ? lters means no backwashing and no downtime in port • Treatment process takes place in transit
Minimal Crew Interface • Ease of system operations • Does not require attention of crew while in port
Power Supply Not Impacted • Continual dosing in transit allows smaller operating unit • Uses power during non-peak demand times • No need to repower a ship
Guaranteed Compliance • No regrowth potential in transit • Able to meet demands of challenging water
Visit eco-enviro.com for more information and download our informative brochure.
Call or click today!
(713) 840-0404 [email protected] www.marinelink.com 81
MR #8 (74-81).indd 81 MR #8 (74-81).indd 81 8/6/2018 12:42:41 PM8/6/2018 12:42:41 PM