Page 10: of Maritime Reporter Magazine (June 2021)
USCG Fleet Modernization Annual
Read this page in Pdf, Flash or Html5 edition of June 2021 Maritime Reporter Magazine
Quotable “Digital will be a key enabler to make the next giganO c leap in how we make improvements in emissions and e? ciency.”
Peter Fitzpatrick,
VP, Strategic Development, ABS
ABS 40 “Evaluat ng a 260-m trimaran 22 sealif ship, comparing the cost of a “Almost two dozen deepwater t tanium vessel with a steel vessel, projects requiring either an found that the acquisit on cost of
FPSO or product on semi the t tanium vessel would be $2.3B compared to $1.5B for a steel ship. look likely to proceed to
However, the lifecycle savings of the development by end next t tanium vessel would be $2.74B. In year. EPC contracts for the other words, once you build the ? rst product on units will have vessel in t tanium, with the savings an aggregate value of $35 to you can build the next vessel for $40 billion. This is a much free.”
Q higher near term ordering
Rik van Hemmen pace and contract value than
President, Mart n & Ot away ant cipated six months ago.”
Jim McCaul
Director, IMA/WER
Watch the full interview with
Jim McCaul on OE TV @ 14 bit.ly/3ceg7pH 10 Maritime Reporter & Engineering News • June 2021
MR #6 (1-17).indd 10 6/3/2021 2:08:24 PM