Page 27: of Maritime Reporter Magazine (August 2022)
The Shipyard Annual
Read this page in Pdf, Flash or Html5 edition of August 2022 Maritime Reporter Magazine
aboard, with Wartsila claiming they offer size and weight ad- vantages and many of the paragon characteristics described above: BMS for every module; water-cooled. The Navius 3 will ship in 2023 and will also be aboard Scandlines’ 10MWh
PR24 zero-emission freight ferry.
No application ceiling
Giga-battery factories:
The size of vessels sporting ESS has only gotten larger. Oil rigs? Check. Maersk has done that and now intend to put them
Britishvolt’s above and Freyer below on a wind installation vessel (see next issue). Boskalis is retro- ? tting offshore vessels to battery for hotel power and standby modes. The ? rst oil tanker (Asahi Tanker) with an ESS on- board has already bunkered-up a MOL car carrier
Tugs, eco-product tankers, car carriers, high-speed ferries with people and cars aboard … nothing can stop electrochem- ical innovation — except repeat, fast-spreading ? res aboard vessels reported, now, nearly everywhere.
“If the industry does not learn, eventually they will not be able to offer a solution. The regulations are only going to get stiffer. Battery suppliers cannot survive if they hope third par- ty systems will ensure the safety of their products. That is the responsibility of the battery suppliers if they expect to be long
Image courtesy: Freyer Battery Image courtesy: Britishvolt term partners to the industry.”
Marine Repair and Vessel Conversions
Of shore Wind Vessel Fabrication and Support
Dry Docks from 1,500 T – 35,000 T Capacity
Onshore Fabrication Facilities with water front access
Of shore Structural Fabrication, Installation and Repair
Machine shops
Of shore Rope Access Inspectors
Certif ed Hull Gauging (DNV/ABS/LR)
Govt. clients include MARAD, MSC, USN, USCG, USACE
Over 70 years of service to the Marine Industry
Galveston – Port Arthur – Corpus Christi - Norfolk (VA) - México (CdC) (281) 752-4835 www.gulfcopper.com | [email protected] www.marinelink.com 27
MR #8 (18-33).indd 27 8/1/2022 10:23:16 AM