Page 28: of Offshore Engineer Magazine (Jun/Jul 2013)

Read this page in Pdf, Flash or Html5 edition of Jun/Jul 2013 Offshore Engineer Magazine

31st international

North Sea Flow

Measurement

Workshop 22–25 october 2013,

The has a large moonpool, over which Noble Globertrotter II tøNSberg, NorWay the BOP is skidded and lowered.

regIStratIoN +47 22 94 75 60 / 61 still being completed in Singapore. [email protected] www.tekna.no/intconf “Together we constructed this drillship,” said Roodenburg. “We used what we had learned on the semis and then worked the ship around it. We always start from a white sheet of paper; that is what we do.”

The GT2’s hull was built at STX Dalian’s yard in China, sailed to Schiedam for ftting out of the topsides equipment tekna - the Norwegian Society of graduate last year and completed in March.

technical and Scientifc Professionals

Key has been challenging the handling principles and low- ering the drilling foor. “Lowering the foor gives you much more payload capacity, at 20,000 tons on HuisDrill compared to 12,000 tons on the

Bully,” said Roodenburg. “That is a big difference—because

Custom of an integrated design. The tower is easier to integrate, the footprint and load spreading is much easier to integrate on to

REPRINts a hull.”

The smaller size of the vessel reduces its construction cost

Take Advantage of your Editorial Exposure by $50-$100 million, said Roodenburg. It also has a lower environmental footprint, lower maintenance, and can be built in various yards.

But having built a small vessel, Huisman is now consider- ing going bigger and introducing full automation.

Give yourself a competitive

Huisman is considering extending the vessel length by 10m so it can handle 150ft lengths of risers, said Precious advantage with reprints. use this logo on white or lighter

Nwokoma, drilling engineer at Huisman. backgrounds “When you run risers in 3000m water depth at 75ft long,

Call us today!

it can take about three to four days,” he said. “The idea is to handle 150ft risers and run them. For that we need extra length in the vessel. It would reduce running time by half.”

While there are no immediate orders for the next HuisDrill, use this logo on black or darker there is interest, says Roodenburg. “We are talking to various backgrounds. The Printing potential clients now,” he said. “Major clients and drilling

Service is in white.

contractors have been on board. All like what they see.”

For additional information, please contact Foster

The Noble Globetrotter I is working for Shell in the Gulf of

Printing Service, the official reprint provider for OE.

Mexico.

The Noble Globetrotter II was due to go out on sea trials at the end of April and will be undergoing mobilization before

C: 56

M: 0

Call 866.879.9144 or heading to Benin. Following a period there for Shell, it is then

Y: 100

K: 27 potentially going to work in the Black Sea in 2014, also for [email protected]

PMS 370 C

Shell.

OE | June 2013 oedigital.com 30 028OE_0613_DC_Huisman.indd 30 5/28/13 9:18 AM

Offshore Engineer