Page 45: of Offshore Engineer Magazine (May/Jun 2014)

Read this page in Pdf, Flash or Html5 edition of May/Jun 2014 Offshore Engineer Magazine

Driving Project Excellence • One of the industry’s most challenging projects

First to install • Rigid insulated pipe-in-pipe production fowlines rigid Reel-Lay • Main umbilical system connecting eight manifolds pipe-in-pipe • Installed in 3,900 feet of water in Asia Pacifc • Client achieved frst oil in February

Visit McDermott at OTC to learn more about our frst of a kind pipe-in-pipe technology

Booth #3517 | May 5-8, 2014 | Reliant Center | Houston, TX USA

Learn more about recent subsea projects www.mcdermott.com/projects

Houston: (1) 281.870.5000 | London: +44 1372.739.397

Careers Subsea [email protected] © 2014 McDermott International, Inc. All rights reserved

MDR_OE_May_2014.indd 1 4/16/14 3:32 PM april-1.indd 49 4/18/14 10:35 AM

Offshore Engineer