Page 24: of Offshore Engineer Magazine (Aug/Sep 2014)
Read this page in Pdf, Flash or Html5 edition of Aug/Sep 2014 Offshore Engineer Magazine
Visit In? eld at
ONS
Stand J 1060
However, this is a low-case view, as Petrobras’ huge debt and However, this is a low-case view, as Petrobras’ huge debt and delays to newbuilds means that their deepwater plans are delays to newbuilds means that their deepwater plans are unlikely to be carried out in their entirety. unlikely to be carried out in their entirety.
Quick statsQuick stats
Elsewhere in Latin America, Mexico’s 2013 energy law reforms will undoubtedly lead to a host of opportunities for IOCs – with
Analysis
OE’s at-a-glance guide to o