Piping systems: on arrangements; pol- the applicable international standards Raja Roy is a princi- 2. lution prevention; ballast piping; and mentioned in 250.901, 2007 NTL G14 pal engineer at DNV transfer system and equivalent DNV GL standards (which GL. He has 22 years

Hazardous locations: Zone 1 and 2 have been accepted by BSEE under the of relevant experi- 3. de? nitions scheme for previous GOM projects). ence in structural

Electrical and instrumentations: engineering for ? xed 4.

DNV GL’s work in the Gulf of Mexico requirements on emergency generator and ? oating offshore loads, detection of conditions of dis- In 2008, DNV was the classi? cation platforms and ves- society and CVA for the ? rst FPSO connection, non-acceptance of ATEX sels.

(BW Pioneer) in the US GOM, for the certi? cation, etc. His expertise includes regulatory His expertise includes regulatory

Fire and safety: USCG requirements coordination for coastal and shelf state coordination for coastal and shelf state

Cascade and Chinook ? eld and is cur- 5. on ? re extinguishing, detection and requirements for offshore projects and requirements for offshore projects and rently working on a classi? cation and wellhead protection. project management for multidisciplinary project management for multidisciplinary

CVA project for a ? oater in the GOM for

Delta House.

classi? cation/veri? cation projects.classi? cation/veri? cation projects.

BSEE requirements:

The other regulatory agency that share jurisdiction on OCS activities is BSEE, which has its own requirements.

BSEE requirements that are related to structures, mooring and foundation are covered under a platform veri? ca- tion program as de? ned in 30 CFR 250 sub-chapter I. The veri? cation program needs to be performed by a nominated

CVA (DNV GL has such authorization).

The CVAs responsibilities during design, fabrication and installation are de? ned in 250.915, 250.916, and 250.917.

As speci? ed in 250.916 for design

SEPTEMBER 15-18 veri? cation for ? oating facilities (FOIs

Pavilhão n°3 - Stand n° 29 e 35I I and FPSOs) the CVA needs to ensure that the requirements of the USCG for struc- tural integrity and stability have been met. Besides the structural integrity and stability requirements, BSEE mandates speci? ed independent assessments for the following: drilling, production and pipeline risers • and riser tensioning system turrets and turret-hull interfaces (for • www.spinagroup.com

FPSOs) foundations and anchoring systems •

Turn-key solution for electrical materials mooring or tethering systems.

Therefore, for these units with DNV GL and plant maintenance class including the US notation, most of the BSEE requirement for the structural integrity and stability inclusive of moor- ing, turret and hull interfaces will be satis- ? ed. Of these, the mooring component of particular interest to both BSEE and USCG

Explosion Cables Cable tray Lighting & Safety is the usage of polyester ropes in the OCS. proof systems Pole systems systems

DNV GL have an extensive quali? cation program for polyester ropes and compo- nents as well as for the suppliers of that component, and standards which meet

BSEE NTL requirements. Both DNV GL’s

Laboratories Grounding Spare parts Tools Panels standard and its quali? cation procedure

Production brands have been used in recent projects for the mooring veri? cation program.

The above assessments can be per- formed under the CVA scheme using