Page 28: of Offshore Engineer Magazine (May/Jun 2015)
Read this page in Pdf, Flash or Html5 edition of May/Jun 2015 Offshore Engineer Magazine
[images] CREDIT: vertical reservoir with 34m (111ft) of net gas-condensate pay, allowing the project to progress.
At the time, Tullow’s exploration director Angus McCoss said the well was
Border bust-up a bold step-out in a “vast stratigraphic
Field of View trap,” adding: “Con? rming produc- ible gas-condensate in excellent quality reservoirs at this location is a great result won’t stop TEN that also demonstrates the strong predic- tive capabilities of our seismic data and prospecting techniques. As a result, we
John Bradbury pro? les Tullow can now move forward con? dently to
Oil’s major TEN development assess the development options for the o