Page 29: of Offshore Engineer Magazine (May/Jun 2015)
Read this page in Pdf, Flash or Html5 edition of May/Jun 2015 Offshore Engineer Magazine
Field of View vertical reservoir with 34m (111ft) of net gas-condensate pay, allowing the project to progress.
At the time, Tullow’s exploration director Angus McCoss said the well was a bold step-out in a “vast stratigraphic trap,” adding: “Con? rming produc- ible gas-condensate in excellent quality reservoirs at this location is a great result that also demonstrates the strong predic- tive capabilities of our seismic data and prospecting techniques. As a result, we can now move forward con? dently to assess the development options for the
Tweneboa and Enyenra (Owo) ? elds in the Greater Tweneboa Area.”
Another Jubilee
TEN will sit just 30km (18.75mi) from
Tullow Oil’s Jubilee, another project pro- duced via FPSO, which came onstream
The TEN subsea layout.
in 2010, and became Ghana’s ? rst deep- water development. and installation for TEN to a
Tullow’s TEN project looks set to fol- Technip-Subsea