Page 26: of Offshore Engineer Magazine (Jan/Feb 2016)

Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2016 Offshore Engineer Magazine

BP Mad Dog Phase 2 Illustrat on (PDF)

BP Mad Dog Rig Repair Project 2012 [Capt on] [copy]

GLOBAL OFFSHORE MARKET FORECAST gineering, procrurement and com- missioning contract with Maersk that will see the unit constructed by

SembCorp Marine in Singapore for the high-pressure, high-temperature

The ? oating

Culzean project in the UK sector of the North Sea. Furthermore, Golar

LNG exercised their second option with Keppel to construct the third GoFLNG, the Golar Gandria.

The ? nal month of 2015 provides slight potential for production market: further ? oating production awards by yearend. Eni’s Coral

South FLNG (Mozambique), Talisman’s Ca Rong Do tension leg platform and FPSO (Vietnam) and Husky’s Madura

MDA-MBH FPSO (Indonesia) are presently tendering. It is, however, very unlikely that all three of these projects award before yearend, with Quest’s present mean case 2016 & beyond

While depressed commodity

Operator Project Province FPS Type

BP Mad Dog Phase 2US Gulf of Mexico Semi prices lend to pessimism,

BP Hopkins US Gulf of Mexico Semi ? oating production systems are

Shell Vito US Gulf of Mexico TLP

Pemex Ayatsil-Tekel Mexico FPSO projected to remain an integral

Sonangol Cameia Angola FPSO component of offshore ? eld

Shell Bonga SW/Aparo Nigeria FPSO

Eni Etan/Zabazaba Nigeria FPSO development. Quest Offshore

Namcor Kudu Namibia FPSO analyst Andrew Jackson

Woodside Browse FLNG AustraliaFLNG

CNOOC Liuhua 11-1 China FPSO explains.

CNOOC Liuhua 11-1 China TLP

CNOOC Liuhua 16-2 China TLP

Santos Ande Ande Lumut IndonesiaFPSO

Octanex Ophir Oil? eld MalaysiaFPSO*

Shell E6 SK 308 MalaysiaFPSO*

Penguins

Shell UK FPSO

Redevelopment

Kangaroo/Echidna

Karoon Brazil FPSO

EPS

Petrobras Libra Pilot Brazil FPSO

Petrobras Sepia Brazil FPSO

Premier Oil Sea Lion 1a Falkland Islands FPSO

Liza Early Prod.

ExxonMobil Guyana FPSO

System * Indicates projects likely to utilize an existing, leased FPSO

The drilling rig support module is removed from its hroughout 2015, one has not had to look far for dire

Source: Quest O

Offshore Engineer