Page 29: of Offshore Engineer Magazine (Jul/Aug 2019)
Subsea Processing
Read this page in Pdf, Flash or Html5 edition of Jul/Aug 2019 Offshore Engineer Magazine
The Peregrino WHP-C platform at Kiewit’s yard in Ingleside, Texas.
It is slated to arrive in Brazil late this year and begin operations in late 2020.
Source: Oscar Ayala/Equinor
JULY/AUGUST 2019 OFFSHORE ENGINEER 29