Page 29: of Offshore Engineer Magazine (Jul/Aug 2019)

Subsea Processing

Read this page in Pdf, Flash or Html5 edition of Jul/Aug 2019 Offshore Engineer Magazine

The Peregrino WHP-C platform at Kiewit’s yard in Ingleside, Texas.

It is slated to arrive in Brazil late this year and begin operations in late 2020.

Source: Oscar Ayala/Equinor

JULY/AUGUST 2019 OFFSHORE ENGINEER 29

Offshore Engineer