Page 18: of Maritime Reporter Magazine (May 15, 1974)

Read this page in Pdf, Flash or Html5 edition of May 15, 1974 Maritime Reporter Magazine

Skikda LNiG Plant," J.M. Bour- guet and R. Schlatter, TEAL,

France ; (5) "The Determination of

Bottlenecks," A. Bendani, CAMEL,

Algeria; (6) The Contractor's Role in Managing a Major LNG Project

Requiring Multinational Coopera- tion," R.E. McHarg, Procon Inc.,

U.S.A.; (7) "Economic Compari- son of Compressor Drivers for

LNG Plants," A.L. Tanner, C.R.

Cooper, E.F . Drucker, and E.J.

Miles, Flour Engineers and Con- structors, Inc., U.S.A.; (8) "Inci- dents Encountered with the Axial

Turbocompressor at Skikda," M.

Gugen and A. Cherifi, SONA-

TRACH, Algeria.

Tuesday, June 25, Afternoon 2 :30 to 5 :30 p.m. Session IV—

Peakload Plants and Liquid Han- dling; co-chairmen : J.M. Geist, Air

Products and Chemicals, Inc.,

U.S.A., and G.F.I. Roberts, British

Gas Corporation, United Kingdom.

Papers: (1) "Custody Transfer

Instrumentation Systems for LNG

Marine Transportation Projects,"

C.F. Moore, El Paso Natural Gas

Company, and R.L. Blanchard,

Trans-Sonics, 'Inc., U.S.A.; (2) "The Method Used at the Receiv- ing Terminal of FOS-SURMER to

Determine the Thermies Delivered by SONATRACH to Gaz de

France," M. Farrugia and M. Che- valier, Gaz de France, France; (3)

LNG Tank Stratification Conse- quent to Filling Procedures," K.A.

Smith and A.E. Germeles, Distri- gas Cabot Corporation, U.S.A.; (4) "Production of a Natural Gas With- in Specifications from Two LNG

Delivery Sources," C. Torrent, Gas

Natural, S.A., Spain; (5) "LNG

Peaksaving Plant—Operation Ex- perience," P.A. Sipple, Air Prod- ucts and Chemicals, Inc., U.S.A.; (6) "Liquefaction and Boil-Off Re- liquefaction Facilities at Canvey

Island," P.W. Eke, E.B. Graham, and T.H. Malyn, British Gas Cor- poration, United Kingdom.

Wednesday, June 26, Morning 9:30 a.m. to 12:30 p.m. Session

V—Marine Transportation ; co- chairmen : R. Boudet, Gazocean,

France, and C.G. Filstead, Conch

Methane Services Ltd., United

Kingdom.

Papers : (1) "Five Year-Ten Year

Projection of Worldwide Shipyard

Capacity of LNG Tankers," I.W.

Robertson, H. Clarkson and Com- pany, Ltd., United Kingdom; (2) "Transporting Gas—LNG vs. Me- thanol," P. Soedjanto, King-Wil- kinson, (International) B.V. The

Hague; F.W. Schaffert and N.C.M.

Mason, King - Wilkinson, Inc.,

U..S.A.; (3) "Thermal and Thermo- dynamic Aspects Regarding the

Operation of LNG Trades," J.P.

Morel and L. Pascual, Technigaz,

France; (4) "Safety Considerations in the Design and Operation of

LNG Terminals," P.J. Anderson and W.W. Bodle, Institute of Gas

Technology, U.S.A.; (5) "Ship- board Jettison Tests of LNG Onto the Sea," L.R. Prew, Shell Interna- tional Marine Ltd., and A. Knee- bone, Shell Research, United King- dom ; (6) "Shipboard Reliquefac-

May 15, 1974 tion of Boil-Off—Technical and

Economic Considerations," J.A.

Lorenzen, J.J. Henry Co., Inc.,

U.S.A.

Wednesday, June 26, Afternoon 2:30 to 5:30 p.m. Session VI—

Storage Systems ; co-chairmen : J.

F. Isamat, Gas Natural, S.A.,

Spain, and O. Khouani, SONA-

TRACH, Algeria.

Papers: (i) "Considerations for the Safety of LNG Storage Termi- nals," L.K. Stone, U.S. Department of the Interior, R.F. Hill, and T.S.

Needels, Federal Power Commis- sion, U.S.A.; (2) "LNG Inland

Transportation with Railway Tank

Cars and River-Going Tankers,"

H.W. Backhaus, Natural Gas Serv- ice Deutschland GmbH, and R.

Janssen, Vereinigte, Tanklager und

Transportmittel, GmbH, Federal

Republic of Germany; (3) "LNG

Storage Tanks for Metropolitan

Areas," M.R. Schuller and J.C.

Murphy, Pittsburgh-Des Moines

Steel Company, and K.F. Glasser,

Consolidated Edison Company of

New York, Inc., U.S.A.; (4) "De- termination of Storage Capacities in an LNG Terminal," R. Vincent,

Gaz de France, France; (5) "Eight

Years of Experience with LNG

Underground Storage," A. Benda- ni, CAMEL, Algeria; (6) "The

Storage System at LNG Receiving

Terminal for Brunei LNG Project,"

K. Yoshida, Tokyo Gas Company, (Continued on next page) 1

In Europe mail to: American Avitron 76 Rue De Stalingrad 78 Huille, France

Phone: 968-97-54 .Title.

Zip simmonds Precision

A new mime in LNG, an old name In cryogenics.

PRODUCERS OF

THE CUSTODY TRANSFER MEASUREMENT SYSTEM

ON THE FIRST AMERICAN LNG TANKERS

TO BE BUILT BY GENERAL DYNAMICS.

Simmonds Precision has applied its 10 years of experience in advanced cryogenic technology to the problem of LNG measurement and come up with the most accurate custody transfer measurement system now available.

That's just one of the reasons General

Dynamics selected the Simmonds Pre- cision system for the first 7 American- built LNG tankers.

If you're a buyer or seller of LNG; or a designer, builder or operator of LNG tankers; you should investigate this new alternative in LNG measure- ment systems before making your final choice.

For technical information about the Simmonds

Precision Custody Transfer Measurement System, just clip the coupon and mail it today.

In the U.S. mail to: Arthur Sievert LNG Systems Mgr.

Simmonds Precision

Instrument Systems Div.

Panton Road

Vergennes, Vermont 05491 (802) 877-2911 TWX 510-299-0039

State.

Country.

Simmonds Precision

INSTRUMENT SYSTEMS DIVISION MR .J 21 ®

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.