Page 18: of Maritime Reporter Magazine (August 15, 1985)

Read this page in Pdf, Flash or Html5 edition of August 15, 1985 Maritime Reporter Magazine

Offshore Europe Stahl (continued) with the Computest System," by

D.G. Clark and P. le Foil, Flope- trol Johnston Inc.; and A. Hard- ing, BP Petroleum Development

Ltd. 12:45 pm: Lunch. 2:00 pm: "Development & Use of a 3D Simulator in Evaluating Reser- voir Development Options: Fateh

Mishrif, Offshore Dubai," by J.

Crick, Total Compagnie Francaise des Petroles; and S.P. Singh, Du- bai Petroleum Company. 2:30 pm: "Application of Radioac- tive Tracers in Oil Reservoir Water- flood Studies," by V.J. Wheeler,

T.V. Parsons, and S.J. Conchie,

AERE Harwell; and B. Durham.

Oil Plus Ltd. 3:00 pm: "In Situ Stress Measure- ments in Inclined Holes in the

North Sea: Application to En- hanced Oil Recovery," by L.W.

Teufel, Sandia National Laborato- ries. 3:30 pm: "The Argyll Field after a

Decade of Production," by R. Bi- fani and C.A. Smith, Hamilton

Brothers Oil & Gas Ltd. 4:00 pm: Coffee break. 4:15 pm: "Experience with Perma- nent Bottom Hole Pressure-Tem- perature Gauges in a North Sea Oil

Field," by J.D. Gallivan, L.J. Kil- vington, and A.J. Shere, Britoil pic. 4:45 pm: "The Thistle Field—An

Analysis of Its Performance & Op- timization of Its Future Develop- ment," by Dr. M.G. Bayat and

Prof. D.H. Tehrani.

Circle 212 on Reader Service Card 20 5:15 pm: "Field Experience in the

Bothamsail Surfactant Flood Pro- ject," by M.N. Cooper, R.A.

Southworth, and D.A Walsh, BP

Petroleum Development Ltd.; and

Dr. J.C. Morgan, BP Research

Centre Ltd. 5:45 pm: Conclusion of session.

Conference Room Two

Drilling

Chairmen: R. J. Rundt, area man- ager, Phillips Petroleum Com- pany UK Ltd.; and D. Bray, drilling manager, Unocal (UK)

Ltd. 9:30 am: "Review of Operational

Experience Drilling Wells Through an Underwater Manifold Centre," by R.K. Hodgson, Shell UK Ex- ploration & Production Ltd. 10:00 am: "Subsea Template Drill- ing in the North Sea—Experience

Gained during the Initial Stages of the Balmoral Development," by D.

Thorpe and P. Tayler, North Sea

Sun Oil Company Ltd. 10:30 am: "Template Drilling-

One Stage Further," by B.H. Van

Bilderbeek, Dril-Quip (Europe)

Ltd. 11:00 am: Coffee break. 11:15 am: "Drilling Vessels Float in Aerated Water," by D.S. Ham- mett, Sedco Forex. 11:45 am: "AC Drives for Drill- ing," by S. Olsen and S. Knudsen,

A/S Norsk Elektrisk & Brown Bov- eri. 12:15 pm: "The Use of Casing

Patches to Improve Workover Suc- cess Rates," by J. D. Neely, BP

Petroleum Development Ltd. 12:45 pm: Lunch.

Safety & Environment

Chairmen: T.A.F. Powell, princi- pal petroleum inspector, UK

Department of Energy; and

C.P. Penny, manager-health, safety, and environmental ser- vices, BP Petroleum Develop- ment Ltd. 2:00 pm: "Process Systems: The

Role of Quality Assurance in Safe- ty," by F.K. Crawley, D.S. Scott, and W.A.F. Brown, Britoil pic. 2:30 pm: "The Potential Role of

Offshore Standby/Rescue Ships," by H.G. McDonald, Offshore Sur- vival Centre. 3:00 pm: "Cost Effective Quality

Management for All Phases of Off- shore Developments," by N.T.

Burgess, J. Kitson, and M.J.

Kemp, Gilbert Associates (Europe)

Ltd. 3:30 pm: Coffee break. 3:45 pm: "OREDA—The Reliabili- ty Data Reference for the Offshore

Industry," by T. Gjerstad, Tech- nica a/s. 4:15 pm: "Safety & Environmental

Auditing for Existing Offshore Fa- cilities," by Dr. C.J. Luck and Dr.

J.G. Sellers, Arthur D. Little Ltd. 4:45 pm: "Natural Radioactive

Scale: The Development of Safe

Systems of Work," by I.M. Wal- dram, Britoil pic. 5:15 pm: Conclusion of session.

Thursday, September 12

Conference Room One

Production Operations

Chairmen: W.A. Downie, produc- tion manager, Conoco (UK)

Ltd., and C.A. Dines, division

Maritime Reporter/Engineering News

B

Safety. When you're lifting a multi- thousand-ton ship, it's the first thing on your mind.

But if you're currently using a wire rope shiplift system, or if you're considering one, you may not want to read the rest of this ad.

THE PROBLEM

As the inset shows, wire rope is comprised of numerous small-diameter wires. Over time, these wires are subject to both corrosion and bending fatigue, posing serious threats to the safety and maintenance of the system. In fact, the progressive corrosion and bending fatigue of wire rope are the primary causes of most recorded shiplift failures.

THE SOLUTION

All Bardex Hydranautics shiplift systems use stud link 4100-ton shiplift system.

BARDGX

HYDRANAUTICS anchor chain instead of wire rope.

This advance in shiplift technol- ogy maximizes the advantages of the marine elevator while elimi- nating the risks and maintenance problems associated with wire rope systems.

Stud link chain provides strength, integrity, and serviceable life many times that of wire rope. Since chain is subject to external corrosion only, it retains its internal strength and lifting capacity.

Unlike wire rope, which requires removal and man- datory testing to failure, the condition of chain is easily determined by visual inspection and a simple diameter measurement.

Accepted by classification societies worldwide,

Bardex Hydranautics shiplift and transfer systems are used in major naval and commercial shipyards, including Hyundai, one of the world's largest.

If you'd rather be safe than sorry, contact Bardex

Hydranautics. We can arrange for engineers to visit your facility anywhere in the world. Call or write

Bardex Hydranautics, 6338 Lindmar Drive, P.O. Box 1068, Goleta, CA 93116, U.S.A. 805/964-7747 or

Telex 658445 HYDRA GOLETA.

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.