Page 16: of Maritime Reporter Magazine (January 2017)
The Ship Repair & Conversion Edition
Read this page in Pdf, Flash or Html5 edition of January 2017 Maritime Reporter Magazine
MARINE SALVAGE: CASE STUDY
Ardent: Cutting Up Troll Solution
Images, starting top left and proceeding clockwise:
Ardent completed removing the
Troll Solution jack-up in November, 2016. Ardent deployed assets from several countries, including the crane barge Conquest MB-1, and a 1,000-ton hydraulic wreck grab from the Netherlands. Further sup- port vessels were deployed from the
U.S. and Mexico.
A computer generated image il- lustrates how Ardent planned to dismantle and dispose of the Troll
Solution next to the active CAAN-A wellhead platform.
A survey print-out shows removed sections of the Troll Solution jack- up as the wreck removal case was ongoing.
Ardent naval architect Roland De
Marco walks in front of the bow piece of the Troll Solution after the salvage team cut and lifted it from the seabed. 16 Maritime Reporter & Engineering News • JANUARY 2017
MR #1 (10-17).indd 16 MR #1 (10-17).indd 16 1/9/2017 11:24:31 AM1/9/2017 11:24:31 AM