Page 36: of Maritime Reporter Magazine (March 2017)
U.S. Navy Quarterly & Maritime Simulation Technologies
Read this page in Pdf, Flash or Html5 edition of March 2017 Maritime Reporter Magazine
Green Marine tion for subsequent loading and unload- in a later phase, planning for CO2 cap- ing. A crane lifts a “bonnet” to attach to ture, for disposal or, perhaps, sale to a the vessel’s exhaust stack. Treatment can downstream user for research.
At full build out, Pasha will be the world’s