Page 26: of Offshore Engineer Magazine (Aug/Sep 2014)

Read this page in Pdf, Flash or Html5 edition of Aug/Sep 2014 Offshore Engineer Magazine

DEEPWATER INTERVENTION

Intervention allies

Sarah Parker Musarra spoke with FTO Services’ features a 140-ton modular handling tower and a 250-ton active heave compensated crane. The ROV launch window has been

Vidar Sten-Halvorsen to learn more about the new signi? cantly enhanced with a dedicated moon pool in the cen-

Island Performer intervention vessel, a product of ter line of the vessel, allowing deployment and recovery of the

ROV in higher sea states. the joint venture between FMC Technologies and

It includes an acoustic doppler current pro? ler (ADCP) array

Edison Chouest O

Offshore Engineer