Page 12: of Offshore Engineer Magazine (Jan/Feb 2019)

FPSO/FNLG Outlook and Technologies

Read this page in Pdf, Flash or Html5 edition of Jan/Feb 2019 Offshore Engineer Magazine

SUBSEA INSIGHTS ‘Install-ability’ ‘INSTALL-ABILITY’

A STRUCTURAL SHIFT FOR

THE SUBSEA SUPPLY CHAIN

BY GREGORY BROWN, Associate Director - Offshore, Maritime Strategies International Ltd.

ate cycle contractors may have changed the subsea ers of single-lift vessels were able to charge hefty premiums for sector for good and as lead times shorten, schedule the ability to handle the hardware safely and install it. A host optimization is an increasingly vital consideration for of

Offshore Engineer