Page 46: of Maritime Reporter Magazine (November 1985)

Read this page in Pdf, Flash or Html5 edition of November 1985 Maritime Reporter Magazine

Wf / ^ lift-dock' Dohar, Qatar lift-dock' Oran, Algeria Your lift-dock" project lift-dock Tobruk, Libya

It's time we talked about your complete solution with the Schiess-Defries lift-dock.

Use our Worldwide experience as specialists in launching, lifting and transferring ships and let us provide you with the best solution in both economy and safety.

Economy: We are interested in saving you money during planning, construction and during operation. Smaller overall investment achieved by cost effective manufacture.

Reduced labour requirement during reduced docking time. Short Sea/Land/Sea time.

Safety: For your personnel, the ship and your lift-dock". The "rigid" platform, designed on the continuous beam principle is an integral bolted unit. The lifting system operates continuously, synchronously and smoothly. Direct load measurements taken at rope anchors are transmitted to a central indicator to avoid docking errors.

SCHIESS-DEFRIES GmbH

RO. Box 1111 46

Schiess-StraBe 61

D-4000 Dusseldorf 11

Tel.: 0211/586-0

Tx.: 8584 431 sdd

The Complete Solution: The SCHIESS-DEFRIES lift-dock" offers you more than just an alternative to other shiplifts. . The feasibility study: our engineers provide you with a professional appraisal. The lift-dock": delivery and installation of its lifting system and platform.

The transfer system: flexible and adaptable to suit all dock conditions. The civil engineering: we can provide all engineering and construction works. Modern technology - reliable, safe and fast is the

SCHIESS-DEFRIES aim. 52

Circle 113 on Reader Service Card

Maritime Reporter/Engineering News

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.