Page 48: of Offshore Engineer Magazine (Oct/Nov 2014)

Read this page in Pdf, Flash or Html5 edition of Oct/Nov 2014 Offshore Engineer Magazine

the platform. Talisman moved fast to ? nd an alternative to permanently stabilize the facility and went to Stavanger-based IK

Norway for a solution.

EPIC

A task force of specialist engineers

A stabilizing from IK and Talisman performed a pre- study, in which several repair options were de? ned and reviewed. The thorough concept evaluation performed in the in? uence study was crucial for the project success, says IK’s project manager,

When the Varg A monotower

Kenneth O. Rosén.

o

Offshore Engineer