Page 82: of Marine News Magazine (November 2010)
Workboat Annual
Read this page in Pdf, Flash or Html5 edition of November 2010 Marine News Magazine
82 MN November 2010
PEOPLE & COMPANY NEWS more days to the working season.
Leader Creek Fisheries’ new haul out system can be configured with up to 10 Holland dollies from Holland
Moving & Rigging Supplies and five crossbeams or trusses. Each 40-ft steel truss consists of two dollies, two accu- mulators and several six by 12-inch
Douglas fir timbers attached to the top to provide a less slippery interface with the vessels. The dollies are mod- ified to be capable of being sub- mersed in water and accumulators assist in regulating the pressure in the hydraulic system. In order to haul out the vessels, dollies are sent down a ramp into the water and the vessel is positioned over the dollies and engaged with the crossbeams. The entire system is then pulled out of the water by a large winch with the hull of the vessel resting on the timbers.
On October 7, 2010, Leader Creek
Fisheries started pulling out vessels with Crowley Maritime’s 40-ft by 140-ft fuel barge weighing 300 ton and one of Crowley’s tugboats weigh- ing 250 ton. When pulling longer scows out of the water, raising the hydraulic cylinders on the dollies compensates for an arc in the ramp.
Miller Boat Line Recognized for
Plane Rescue on Lake Erie
A Captain and three crewmen from the passenger/vehicle ferry service,
Miller Boat Line, Put-in-Bay, Ohio, were honored with a Certificate of
Appreciation given by the ODNR
Division of Watercraft. The honor of "lifesaving efforts" was given to
Captain Steve Rose and crew mem- bers Jacob Market, Bernie Wise and
Greg Johnson. The four men were working aboard a Lake Erie Islands ferry, the William Market, on the morning of Friday, August 13, 2010, when a single-engine, privately- owned plane crashed into the lake near the Miller Ferry Lime Kiln
Dock, Put-in-Bay, Ohio. Captain
Rose responded to the accident quickly and brought the ferry along- side the four plane victims in the water. The crew threw life rings, then brought the victims aboard the ferry.
The downed plane sank in less than two minutes. All four plane passen- gers were unhurt and taken to the
Put-in-Bay Miller Ferry Dock where they were treated then released by the
Put-in-Bay EMS. The plane was attempting to land at the Put-in-Bay
Airport when it lost engine power.
ENPRO Renews Environmental
Services Contract with USCG
ENPRO Services, Inc., a firm spe- cializing in the management of oil and hazardous waste, announced the extension of their long-standing con- tract to provide environmental servic- es to the U.S. Coast Guard. The serv- ices ENPRO provides to the Coast
Guard include containment, mitiga- tion and cleanup of oil and hazardous material spills in New England water- ways. ENPRO also holds certifica- tions with the Coast Guard as a pre- qualified Oil Spill Removal
Organization (OSRO) and ship-to- shore transfer contractor for the First
Coast Guard District, which includes
Massachusetts, Maine, New
Hampshire, Rhode Island,
Connecticut and Vermont.
Austal Awarded Contract for JHSV 4 & 5
Austal received word to move for- ward with the construction contract for the fourth and fifth vessels of the
U.S. Department of Defense’s next generation multi-use platform, the
Joint High Speed Vessel (JHSV), as part of a program potentially worth over $1.6b. Austal received funding previously from the Navy, valued at $99,557,548, to acquire long lead- time material, to include diesel engines, water jets and reduction gears, for these two vessels in June 2010. The additional work is valued at approximately $204.6m.
Waller Marine Delivers Caissons to Venezuela
Waller Marine, Inc. recently deliv- ered two large steel caissons to clients in Venezuela to be used for closure of
Marterella
Barczak
Turner Rhoda Joe Rella (center) & Austal Apprentices