Page 35: of Marine News Magazine (January 2011)

Vessel Construction & Repair

Read this page in Pdf, Flash or Html5 edition of January 2011 Marine News Magazine

PosiTector ®

UTG

Ogdensburg, New York USA • Phone: 315-393-4450

FAX: 315-393-8471 • Email: [email protected]

N

EW 1-800-448-3835 or www.defelsko.com

New

UTG ME

Thru-Paint model available

Wall Thickness and Corrosion Gage...

Ideal for measuring wall thickness and the effects of corrosion or erosion on ship hulls, decks, bulkheads or any structure where access is limited to one side. a73 Scan Mode a73 HiLo Alarm a73 Internal Memory a73 Sturdy, compact design a73 Certificate of Calibration

Ultrasonic Thickness Gage www.marinelink.com MN 35

The vision of the expanded Alaska Ship & Drydock facilities. Construction on

Ship Hall No. 1 on the left begins in 2011 with a planned completion date in 2012. The concrete pad for Berth No. 1, in front of Ship Hall No. 1, is com- plete, but the canopy is planned for the future as funding becomes available.

The steel fabrication shop for a panel line, to the left of Ship Hall No. 1, and

Ship Hall No. 2, are both planned for the future as funding becomes avail- able. Drydock No. 2, in front of Berth

No. 1, is a land-level transfer system that went into service in 2009. Drydock

No. 1, to the far right, went into service in 1987.

Photos cour tesy Alaska Ship & Drydock

Marine News

Marine News is the premier magazine of the North American Inland, coastal and Offshore workboat markets.