Page 45: of Marine News Magazine (October 2011)
The Yearbook
Read this page in Pdf, Flash or Html5 edition of October 2011 Marine News Magazine
The prequalification documents are scheduled to be posted onthe Port website in October 2011, http://www.polb.com/economics/contractors/rfq_rfp/rsoq/.For further information regarding this project, please contact Ann Tobin, P.E. Program Manager at [email protected](emails only).PREQUALIFICATION OFSHIPYARDS FOR NEWFIREBOATSPORT OF LONG BEACHPort of Long Beach, Long Beach, CA intends to prequal-ify shipyards in November 2011 for the bid of construc- tion of two new fireboats. Theprequalification process willdetermine eligible bidders.The bid period for the project is anticipated to occur in the summer of 2012. As envi- sioned, the vessels will be approximately 105 feet in length with a pumping capacity of 35,000 to 40,000 gallons per minute. The new fireboats are being designed for enhanced capabilities in fire service, security, command and control, emergency medical service, fire suppression, search andrescue, chemical, biological, radiological, and nuclear detec- tion and mitigation, pollution control; and underwater search and recovery. TUTOR-SALIBA CORPORATION Contact: James Foster 818-362-8391EM1068Official # 534891 - 1021 net/Gross Tons - Built 1928 in Oakland CA. LOA 258.5' - Beam 38' - Depth 12'. Flat Deck Barge, riveted steel con- struction, raked bow and stern. 6" asphalt wear deck with 3' steel fenced sides running port and starboard. Barge is also outfitted with 2 Clyde two drum waterfall winches. $300,000.00.EM1163- 125' x 34' x 9' Flat Deck Barge s/n 1065170 c/w 12 hatches, 4 bitts, 6 kevels, 25 degree raked bow/stern, stern w/skaggs. $125,000.00.MN#10 (32-49):MN 2011 Layouts 10/4/2011 12:21 PM Page 45