Page 10: of Marine News Magazine (February 2013)
Bulk Transport Leadership Roundtable
Read this page in Pdf, Flash or Html5 edition of February 2013 Marine News Magazine
VESSELSUS Fab, a Vigor Industrial company, will soon begin construction on a 250?x70?x15?8? deck barge for Harley Marine Services at Vigor?s Swan Island shipyard in Portland, Oregon. This purpose built barge was designed by Jensen Maritime Consultants to transport a wide variety of cargo between Dutch Harbor and Akutan, Alaska with up to 3 runs per week. The barge, which will be named Iliuliuk Bay, an Aleut name meaning big island, is designed to house a 230 ton lift capacity Manitowoc 4100 crawler crane. The vessels? unique design features both D-rings to secure containers up to three high as well as eight lashing bars running fore and aft for other cargo such as heavy construction machinery or general equipment.Harley Marine Awards US Fab Contract to Build Deck Barge Damen Shipyards Gala i (Romania) has launched the World Diamond, the rst of a series of six fully equipped Platform Supply Vessels for Norwegian offshore company World Wide Supply. The PSV 3300 series is part of Damen´s newly designed range of DP2 platform suppliers. Damen cooperates with a number of specialized suppliers and co-makers, respectively: Helmers (insulations, upholstery and furniture), Eekels (electrical equipment and installations), Den Breejen (painting and conservation? and Johnson Control together with De Haan Galati (air conditioning and ventilation). The PSV 3300 can also carry conventional containers on deck for diverse cargo. Furthermore, this DP2 platform supplier has re- ghting capabilities and is provided with oil recovery equipment. Through its hull shape, coatings, the location of oil tanks, refrigerants, recovery of waste heat and engine emissions, the PSV 3300 CD ful ls the latest requirements of Clean Design and Environmental Protection standards of the major classi cation societies. First PSV 3300 for WWS LaunchedFebruary 2013 10 MNMN Feb2013 Layout 1-17.indd 10MN Feb2013 Layout 1-17.indd 102/1/2013 3:45:53 PM2/1/2013 3:45:53 PM