Page 27: of Marine News Magazine (September 2015)
Inland Waterways
Read this page in Pdf, Flash or Html5 edition of September 2015 Marine News Magazine
ery, stores, and whatever else is deemed to be mission criti- P H
ATCHING THE OLE cal, actually match. Builders are happy to give you the gal- Construction contracts are often signed before structur- ley sink, but may have to draw some lines with everything al engineering and system designs are complete. General else. Penciling out your plans “to scale” on graph paper is arrangement drawings are provided on the basis of only be- somewhat helpful initially, but bear in mind that things will ing a “general representation.” The ambiguity can be light- have to change with the addition of structural supports, ened with detailed construction speci