Page 18: of Offshore Engineer Magazine (Mar/Apr 2014)

Read this page in Pdf, Flash or Html5 edition of Mar/Apr 2014 Offshore Engineer Magazine

maintenance. With offshore

Fig. 2: The production ef? ciency challenge platforms, the persons on • Equipment projected as not ? t for purpose board (POB) limitation is

Quick stats • Increased congestion of equipment and removal of the biggest single bottleneck redundant equipment

OE’s at-a-glance guide to o

Offshore Engineer