Sail-Equipped Motorship Feasible
This article deals with the efforts of Nippon Kokan K.K.
which, in collaboration with the Japan Marine Machinery Development Association, tried to develop, by fully utilizing modern techniques, sail-equipped motorships that can operate under present-day conditions. The research and development was started in 1978 and extended over a period of more than two years.
It included wind-tunnel tests, the design and manufacturing of sails, sea trials of the experimental- ship Daioh, and feasibility study based on these test results.
Objectives Among wind-propulsion equipment, including those used in the past, there are the Flettner rotor, wing mill, gull wing, wing sail, square sail, fore-and-aft sail, slotted sail, aerogenerator (electric propulsion), etc. Each windpropulsion equipment has its own characteristics, and an optimum one should be selected applying the decision criteria in conjunction with the conditions under which the wind-propulsion equipment is utilized. Although there are many decision criteria, and it is very difficult to select the optimum equipment, the following items are considered as the prerequisites for the commercial application of the wind-propulsion equipment.
1. Its energy conservation effects must be high, utilizing a wide range of wind forces effectively.
2. It must be mechanized and a special crew should not be necessary.
The equipment should not obstruct cargo handling.
3. It should maintain the safety of the crew and cargo on the same level as on conventional ships.
4. Its maintenance and repair work should be reduced as much as possible.
Various kinds of wind-propulsion equipments were assessed applying these criteria, and it came to the conclusion that using wind energy directly as a propulsive force by sails was the most effective and practical method for employing this natural power.
From the viewpoint of aerody aerodynamic performance, fore-and-aft sails including semirigid wing sails, and square sails, including slotted sails, were considered the most promising candidates for sailing equipment for commercial ships.
Also, in consideration of the general applicability of the sailing equipment, the following conditions were added: 1. It should be applicable to ordinary motorships without any special countermeasures.
2. It is used as auxiliary power, with the aim of reducing the fuel consumption of the engine, since modern commercial ships need a relatively high speed and punctuality.
Considering all of these items, the main goals of this study were decided as follows: 1. Type of ship, size and speed —10,000 to 35,000-dwt bulk carrier with a speed of 10 to 15 knots.
2. Energy conservation capability — Conservation of over 10 percent in fuel consumption.
3. Mechanization and automation of the equipment.
Development At first, wind tunnel tests were conducted systematically to investigate the aerodynamic characteristics of various sails. Development of sailing equipment for the experimental-ship Daioh was based on these results and performance of the selected sail was repeatedly checked by the wind tunnel tests, on-shore tests, and sea trials.
The validity of the estimation method used to predict the power gained by use of sails onboard the ship was verified by comparing the data obtained during the sea trials with the estimated value.
The various parameters related to sail form were determined after considering both the construction costs and the various objectives and by referring to the results of the wind tunnel tests. As a result, three types of sail were selected for the experimental-ship Daioh: One set of rigid sail from the standpoint of the best sail performance, one set of soft sail from the standpoint of the low cost, and one set of triangular sail to manage the head wind.
Although all three types differ in certain respects, their operations were mechanized in preparation for adopting full automatic operation in the future.
At the same time, studies on maneuverability and stability were thoroughly conducted and rudder area and bilge keels enlarged.
Tests On Daioh Before carrying out the sea trials, tests were conducted onshore to check whether the data obtained from the wind tunnel tests could be utilized for estimating the performance of the sails on the Daioh. Strain gauges were installed at four points at the bottom of the mast for the rigid sail to measure the force on the sails through the strain on the mast.
Sea trials were conducted to determine whether the various estimated performance assumed from the results of the wind tunnel tests could be applied to the actual ship, that is, whether the three mechanized types of sails would operate as planned.
The average of the measured ship speed was about 95 percent of that estimated and conformed approximately to the estimated speed when the ship ran under both the engine and sails. On the other hand, when the ship ran under sails only, the average of the measured ship speed was about 85 percent of the estimated speed and the deviation between them was adjusted.
These deviations between the estimated ship speed and the measured ones in both cases were thought to be mainly caused by the assumed conditions utilized in estimating the ship speeds.
Then the ship speeds were estimated again using actual data on the angle of attack of the sails, drift angle and the rudder angle that were obtained at the sea trials. Also, the wind force acting on the hull neglected before was taken into consideration and the data obtained at the wind tunnel tests were utilized.
When the ship ran under both the engine and sails, the measured ship speed conformed to the estimated speed accurately enough and it was proved that the sail performed well as the results at the wind tunnel tests.
On the other hand, when the ship ran under sails only, there were still approximately 10 percent deviation between the estimated ship speed and the measured speed. The reasons for this deviation were thought to be bad steerability due to stoppage of the engine, intensification of the effects of the waves, wind velocity and wind direction due to the slow speed. To analyze these effects quantitatively from only the data obtained is difficult, but the causes were made clear and more accurate estimation can be expected when the ship runs under the sails only.
Target Ship In conducting studies on the possibility of producing a sailequipped motorship that satisfies the conditions given and while simultaneously considering the popularization of sail-equipped motorships, outline specifications of sail equipment like those for conventional ships were determined.
Figure 1 shows a 20,000-dwt bulk carrier with a sail area of 850 square meters on each of three masts.
Developing a sail-equipped motorship was based on the following motto: "Main: Engine; Auxiliary: Sail." In regard to this, actual propulsion control offers two possibilities: (1) constant ship speed, and (2) constant engine output. In the former case, since ship speed is constant without being affected by wind direction or wind velocity, engine capacity should be identical to that for conventional ships, and the objective should t h e r e f o r e be economy of fuel consumption due to the horsepower gained from the sails. On the other hand, with the latter type, if engine output is constant, ship speed is not constant as it depends on wind utilization.
However, if the average ship speed throughout the entire voyage is the same as in (1), it becomes possible to use a smaller main engine than is used on conventional ships.
After comparing the two possibilities and considering the implications of propulsion control concerning ship schedules, it can be seen that possibly (1), in which the ship speed remains constant, is far more practical.
In the case of the speed being kept constant, the relationship between the propulsive power of the sails and main engine output is as shown in Figure 2. The main engine is controlled in such a way that total output will be constant as much as possible.
In this system, when a fixedpitch propeller is used, the number of revolutions is controlled. If a variable-pitch propeller is used, the blade angle and number of revolutions are controlled resulting in an engine load that achieves maximum fuel economy while keeping constant speed.
Conclusions T h r o u g h these studies and tests, main results were obtained as follows: 1. The sail-equipped motorship in which sails are used as auxiliary (not as main) source of propulsion seems to be most feasible at the present stage.
2. Laminar flow type rigid sails which were mechanized fully were found to be one of the optimums for practical sail equipment.
3. Considering the increase of the fuel oil price in the future, sail-equipped motorships seem to be economically feasible at this time, by the effect of the costdown of sailing equipment.
Ocean transportation is in a state of emergency due to recent rapid increases in the price of fuel for ships and to the growing uncertainty of fuel supply, both of which have made it imperative to take measures for the conservation of fuel. Under such conditions, the re-emergence of wind force as a natural source of energy for the propulsion of ships through modern techniques has become of g r e a t s i g n i f i c a n c e.
Even during the period of two years while this research and development was being conducted, the petroleum situation has undergone drastic changes. These conditions indicate that the time is fast approaching when sailequipped motorships will become feasible on a commercial basis.
As a result of feasibility studies made using a 10,000 to 35,000- dwt bulk carrier, the first stage of the development process, it was established that this type of ship can be operated profitably.
However, when the actual equipping of the ship was considered, there were and still are many problems to be solved regarding maneuverability which must be studied in more detail; maneuverability in docking, mooring and when in harbor movement; the crew needed for this type of ship and their mastery of the operational techniques; the selection of the most suitable routes for specific voyages, etc. Solving these problems has thus become the task that will be undertaken during the second stage of the development process.
Fortunately, a prototype of a sail-equipped motorship for which various experiments are scheduled and on which high expectations are placed is planned for completion during 1980.
Read Sail-Equipped Motorship Feasible in Pdf, Flash or Html5 edition of March 15, 1981 Maritime Reporter
Other stories from March 15, 1981 issue
Content
- Latest Rig Order From Santa Fe Drilling Brings Total To $442 Million page: 4
- CAI Introduces New Keyboard-Operated SSB Transceiver Line page: 5
- J.J. Henry Company Opens West Coast Office In San Diego page: 7
- Hampton Roads SNAME Section Hears Paper On Rudder Torque Prediction page: 7
- $9-Million Contract For Bulk Transfer Facility Won By Dravo Wellman page: 8
- Barge Contract Raises Bath Iron's Orderbook To About $767 Million page: 8
- ON THE COVER page: 10
- A.J. Herrington Named Marketing/Sales Manager At Waukesha Bearings page: 10
- McAdams And Perk Named Construction Supers At Conrad Industries page: 10
- Marine Port Engineers Fort Schuyler Forum Scheduled For March 21 page: 10
- TBW Industries Names Manufacturing Licensee For United Kingdom page: 12
- $4-Million Contract For SPM Terminal In Java Sea Awarded To IMODCO page: 12
- P.Y. Wang Joins Lexington Transport As Senior Marine Superintendent page: 12
- Swiftships Delivers Aluminum MTU-Powered Service Vessel page: 14
- New Drydock Installed At Todd Shipyards' New Orleans Division page: 14
- J. Erik Hvide Named President And COO Of Hvide Shipping page: 14
- Hitachi Gets Order For Two More Drilling Rigs For Hunt Group page: 16
- DEBEG Watch Receiver Approved By FCC page: 16
- Hostelley To Supervise Republic's Non-Ocean Marine Transportation page: 16
- Richard Hopkins Promoted To Vice President Of J.J. Henry In Moorestown page: 17
- ALCO Power To Introduce New Model Diesel Engine —Literature Available page: 17
- Modernized Wharf In New Orleans Gives Todd Yard Expanded Capacity page: 18
- Chevron's W.H. Banks Named Board Chairman Of AIMS page: 18
- Breedlove And Berger Named To New Posts At Wall Rope Works page: 18
- Avondale To Acquire New $50-Million Drydock For Ship Repair Work page: 20
- Uniflite Gets $690,000 Navy Contract For Five Utility Boats page: 20
- 'Speed Sincher' Cuts Onboard Lashing Time —Literature Available page: 22
- Harold Smith Appointed General Manager Of Detroit Diesel Allison page: 22
- $2.6-Million Modernization Contracts Awarded To TTS By Vemar Yard page: 23
- Sail-Equipped Motorship Feasible page: 24
- Gems Level Switches Meet Latest Self-Checking Capability Requirements page: 28
- Three Executive Promotions Made By Tidewater Marine— Allgood Named President page: 31
- William Black Appointed President Of Moran Transportation Industries page: 36
- Spanish Ferry Company Adds Second Jetfoil In Canary Islands Service page: 38
- ASNE Section Meeting Held At Naval Submarine Base In New London page: 38
- Chick And Davie Named Regional Sales Managers For Gdynia America Line page: 40
- Non-Slip Deck Coating Helps Prevent Falls Aboard Rigs And Ships page: 40
- COMSAT To Sponsor Maritime Satellite Seminar On April 29 page: 41
- San Diego SNAME Hears Paper On Ship Machinery Automation page: 41
- Navire Linkspan To Serve Isle Of Man RO/RO Operation page: 42
- $2-Million Federal Grant Awarded To Massport For Pier Renovation page: 42
- R.B. Bittner Named VP And Chief Engineer For Riedel International page: 42
- Raytheon Building $1.4-Million Magnetic Measuring System For USN page: 43
- $1.9-Million Navy Contract Awarded To Nationwide Boiler Rentals page: 43
- Shipboard Electrical Cable Discussed At New York SNAME page: 44
- Transamerica Delaval Licensed To Build Stork-Werkspoor Diesel page: 44
- Racal Electronics Plans To Acquire Full Ownership Of ITT Decca Marine page: 45
- Waste Heat Recovery Handbook Available From American-Standard page: 45
- Foss Seattle Shipyard Named Cummins Dealer For Parts And Service page: 46
- Chen Named General Manager, Tan Sales And Commercial Manager, Of Sembawang Yard page: 46
- W.E. Haggett Appointed President And COO Of Bath Iron Works page: 47
- McFadden And Klose Appointed Assistant Vice Presidents At J.J. Henry page: 47
- Northern California SNAME Hears Paper On RO/RO Ships page: 48
- J.M. Blenkhorn Appointed President And CEO Of Equitable Shipyards page: 48
- Boeing Sells $13.7-Million Jetfoil To Indonesia page: 48
- New HITCO Brochure Covers High-Temperature Insulation Textiles page: 49
- IHI Delivers VLCC 'Nissho Maru' To Idemitsu Tanker Company page: 49
- SNAME Philadelphia Section Discusses Finite Element Method page: 62
- Vosper Limited Group Gets Three Contracts Worth $29 Million Total page: 62
- Newest Waterman Steamship LASH/Containership Enters Service page: 62