Litton Marine Systems Supplies IBS Order

Litton Marine Systems will supply integrated bridge systems (IBS) for two new cruise ships for Royal Caribbean International (RCI).

The two vessels are currently under construction at Meyer Werft Shipyard in Papenburg. Radiance of the Seas, will be delivered in early 2001, with the second vessel scheduled to arrive during the second half of 2002.

In accordance with Royal Caribbean's two-bridge concept, each vessel will house a completely redundant package comprised of two independent Vision 2100 integrated bridge systems. The total package will include interswitched BridgeMaster E S-band and X-band radars, a Sperry Marine Voyage Management System (VMS) with ECDIS and a docking system.

Litton also supplied the IBS installations for RCI's Eagle-class ships, the first being Voyager of the Seas delivered late last year.

Circle 3 7 on Reader Service Card

Maritime Reporter Magazine, page 27,  Feb 2000

Read Litton Marine Systems Supplies IBS Order in Pdf, Flash or Html5 edition of February 2000 Maritime Reporter

Other stories from February 2000 issue

Content

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.