Dresser-Rand Equips Petrobras FPSO

A new floating production, storage and off-loading (FPSO) facility being built to extract oil and gas from offshore Brazil will include gas compression modules worth approximately $35 million from the Dresser- Rand Company. The FPSO. which will operate in the Petrobras Albacora Leste field, is anticipated to produce approximately 180,000 barrels of oil and 6 million cu. m. of gas a day.

The compression equipment will be used for gas lift oil production as well as for gas transmission from the FPSO by pipeline to shore. Operation is expected to begin in September 2003. Dresser-Rand will provide three compression trains including DATUM high-efficiency centrifugal compressors driven by variable speed drive (VSD) electric motors, and a control room.

Manufacturing of the compressors and string testing will be conducted at Dresser-Rand's facility in LeHavre, France. In addition, the company will conduct full Class I hydrocarbon testing of the compression equipment. Each of the three compression trains will be shipped in late 2002 for delivery at the Port of Rio. In addition, Dresser-Rand will be responsible for the engineering, procurement of materials and construction of the gas compression modules in Brazil.

Circle 2 on Reader Service Card www.maritimereporterinfo.com

Other stories from April 2002 issue

Content

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.