ELASTEC Introduces 1.5 Meter BoomVane
ELASTEC’S 1.5 meter ELASTEC BoomVane is designed to quickly deploy heavier oil booms in coastal and open waters in advancing sweeping and skimming applications – with only one towing vessel. No longer limited by the length of a sweep arm, wider boom swaths can be configured with the unharnessed power of the BoomVane to tow the boom into position. BoomVane also solidly holds the swath configuration in place, maneuvered by the boat’s captain.
www.elastec.com
(As published in the May 2015 edition of Marine News - http://magazines.marinelink.com/Magazines/MaritimeNews)
Read ELASTEC Introduces 1.5 Meter BoomVane in Pdf, Flash or Html5 edition of May 2015 Marine News
Other stories from May 2015 issue
Content
- Marine News Editor's Note page: 6
- Insights: Jane Bugler - Technical Director, IMCA page: 12
- DNV GL Tackles Safety through Standards page: 18
- Offshore Workboat Fire Safety page: 22
- Suppression of Random Drug Test Results: A Bad and Unnecessary Decision page: 26
- Hybrid Power for Workboats: The Future is Now page: 28
- Offshore O&G: Weathering the Storm page: 34
- Five Years on from Macondo page: 38
- The Ever-Evolving Rapid Response Skimmer page: 43
- Optimizing Efficiency Requires Measurement of True Output page: 46
- ThomasNet.com: Sourcing Solution for the Marine Industry page: 48
- SeaHow’s New Generation Skimmer System page: 56
- ELASTEC Introduces 1.5 Meter BoomVane page: 56