Coflexip Stena Awarded $58 Million Contract

One of Coflexip Stena Offshore's U.K.

entities was awarded a large EPIC contract worth $58 million by BG International for its Blake subsea field, offshore Scotland at a depth of 295 ft. (90 m).

Situated approximately 9.5 km North of the Ross field in the Moray Firth, the Blake field will be tied-back to the existing Ross FPSO Bleo Holm, operated by Talisman.

Work scope for the project includes the installation of all the subsea structures and control system, including a manifold with six production wells gathered around, as well as two satellite water injection wells.

The engineering, manufacturing and installation of all the flowlines (rigid reeled, pipe in pipe, flexible) and umbilicals for the infield and tie-back connections; and the disconnection/reconnection of the FPSO that will be towed to and back from a conversion yard during Summer 2001.

Maritime Reporter Magazine, page 16,  May 2000

Read Coflexip Stena Awarded $58 Million Contract in Pdf, Flash or Html5 edition of May 2000 Maritime Reporter

Other stories from May 2000 issue

Content

Maritime Reporter

First published in 1881 Maritime Reporter is the world's largest audited circulation publication serving the global maritime industry.